GA600AC Sliding Gate Opener User Manual
13
Step 9 - Powering on
·
Ensure that the outer cover has been fitted and fastened back onto the motor base.
·
Before powering up the gate opener make sure the gate can travel by hand in manual mode
(key unlocked).
·
Slide the gate to between the middle of the posts, approximately (see below diagrams).
·
Lock the manual release spanner (key locked) in readiness for automatic mode.
·
Plug the power cord into an approved RCD protected weatherproof outlet.
·
Remote controls included in this kit are factory paired ready for use.
Figure 13
Please note: Warning signs
provided must be displayed
facing the street side.