![Gatekeeper Systems SV12 User Manual & Install Manual Download Page 12](http://html1.mh-extra.com/html/gatekeeper-systems/sv12/sv12_user-manual-and-install-manual_3736421012.webp)
SV12
User Manual & Install Guide
12 of 26
Connections
▪
Plug the CAB000469 cable on the back of the device. The sensors on CAB000469 cable will
connected to the corresponding sensor source. (i.e. the left turn signal on the vehicle for LT etc).
The power connections are explained below:
GND
(A)
(Black)
Connect to the negative terminal of the battery, -12V.
Typically, grounds are established in the fuse panel, and
installers would need to connect there.
IGNITION
(B)
(Yellow)
Connect to the vehicle ignition, +12V, the signal required to
activate the device. Ensure that the provided 3 AMP
fuse is used. Ignition is obtained from the “cold” side
of the solenoid.
POSITIVE
(C)
(Red)
Connect to the positive terminal of the battery, +12v.
Ensure that the provided 15 AMP inline fuse is used. +12V is
obtained from the “hot” side of the solenoid, or the cables that
connect directly to the battery from the fuse panel
▪
CAB000470 cable is to connect the cameras and the monitor. On the other end of the cable,
you have four standard connectors to connect the four wide angle cameras (included in the
package) and the D1 or AHD port to connect to the monitor, DVR, or the mirror display.
CAB000470
Wire Labelled as:
Connect to:
CAM1
Left Camera
CAM2
Right Camera
CAM3
Front Camera
CAM4
Rear Camera
CBVS
D1 quality
Yellow AHD
Analog HD
USB
To transfer the files from and to
Sv12
RS45
Not in use
IR Signal Receiver
To receive the signals from IR
remote Controller
Mounting the cameras
▪
Make sure that the cameras are mounted perpendicular to the ground.
▪
Mount the cameras at the centre of each side.
▪
Don’t mount the camera on the curve.
▪
Make sure to mount the cameras on the same height on the vehicle. (For vehicles with a front
engine the front camera needs to be mounted at the front most part of the vehicle, i.e. the
bumper)
▪
All cables running through holes in sheet metal (ceiling, bulkhead, etc.) must be protected
with grommets.