background image

1

MEANING OF THE SYMBOLS AND SAFETY INSTRUCTIONS

1.1

MEANING OF THE SYMBOLS

WARNINGS

Keywords indicate the seriousness of the hazard in 

terms of the consequences of not following the safety 

instructions.

• NOTE indicates that material damage may occur.

• CAUTION indicates that injuries may occur. 

• WARNING indicates that serious injury may occur.

• DANGER indicates potentially risk to life.

IMPORTANT INFORMATION

Warnings in this document are framed and 

identified with a warning icon which is 

shown on the left figure.

Electrical hazards are identified by a 

lightning icon surrounded by a warning 

triangle.

Important information in cases where there 

is no risk of injury material losses is  

identified by the symbol shown on the left. 

It is bordered by horizontal lines above and 

below the text.

After having removed the packaging, check that the
material supplied is intact and complete; if this is
not the case, contact with GASSERO or dealers.

The Alubox Series boilers must be installed by 
authorized person as detailed under any current
standards and law applicable and with the instruc-

tions provided by  Gassero in the manual given

with the appliance.

The boiler must be used for the purposes it has
been expressly manufactured. Gassero declines
all contractual and extra-contractual liability for
damage caused to persons, animals or things, due
to errors in installation, control, servicing or impro-
per use.

In case of the water leakage, disconnect the boiler
from the mains power supply, close the water sup

-

ply and promptly notify Gassero or other authorized 
qualified personnel.

Periodically check that the condensate drain is free
of blockages.

Periodically check that the operating pressure of
the water circuit when cold is 

1.5 bar

and less than

the maximum limit specified for the appliance. If this
is not the case, contact with Gassero or other aut - 
horized qualified personnel.

If the boiler is not used for an extended period, the
following operations must be completed: 

- move the main system switch to "off"
- close the fuel cock and the water cocks on the cen -

tral heating system

- empty the central heating system if there is the risk

of frost.

Maintenance and servicing must be done once a year. 

This manual is an integral part of the boiler and as a
consequence must be kept with care. If the manual
is damaged or lost, contact with Gassero to supply   
a new copy.

PLEASE READ THESE INSTRUCTIONS CAREFULLY 

BEFORE STARTING INSTALLATION.

THESE INSTRUCTIONS ARE APPLICABLE TO THE 

GASSERO BOILER MODELS WRITTEN ON THE 

FRONT COVER OF MANUAL ONLY AND MUST NOT 

BE USED WITH ANY OTHER BOILER MODELS. 

THIS APPLIANCE MUST BE INSTALLED BY A GAS SAFE 

REGISTERED, AUTHORIZED PERSON. FAILURE TO 

INSTALL CORRECTLY COULD LEAD TO PROSECUTION.

IF YOU HAVE ANY QUESTION CONTACT THE GASSERO

TECHNICAL SERVICE. ([email protected],

PLEASE LEAVE THESE INSTRUCTIONS WITH THE 

COMPLETED INSTALLATION CHECKLIST, AND USER 

USER MANUAL WITH THE OWNER OR AT THE GAS 

METER AFTER INSTALLATION OR SERVICING. 

THE INSTALLATION AND COMISSIONING CHECKLIST 

CAN BE FOUND IN BACK PAGES THE MANUAL.

1.2    GENERAL WARNINGS

Actions that absolutely must not be 
carry out identified by the figure on left 

Meaning of the Symbols and Safety Instructions 

+90 216 394 09 85 )

Manually controlled gas valve shall be placed before 
the boiler. 

Summary of Contents for Alubox Series

Page 1: ...1015 14 Alubox 540 Alubox 700 Alubox 1100...

Page 2: ......

Page 3: ...General warnings 2 General 5 2 1 Designated use 5 2 3 Boiler room ventilation 5 2 2 Description of the appliance 5 3 3 1 3 Safety instructions 4 1 4 Regulations and standarts 4 2 4 Packaging label 6...

Page 4: ...r authorized quali ed personnel Periodically check that the condensate drain is free of blockages Periodically check that the operating pressure of the water circuit when cold is 1 5 barand less than...

Page 5: ...o the constructive components which in uence the When tightening or loosening the screw connections use only adequate tool The improper use and or the use of inadequate equipment can cause damages If...

Page 6: ...or stored 2 1 DESIGNED TO USE 2 3 BOILER ROOM VENTILATION These installation and maintenance instructions apply to General TheAlubox is a oor standing aluminium condensing boiler for CH and DHW with...

Page 7: ...1015 14 Production year Istanbul Endustri ve Ticaret Serbest Bolgesi FREE ZONE 4 Sok Parsel 110 34957 Tuzla Istanbul TURKEY www gassero com 1015 14 1 1...

Page 8: ...IONS M System ow DN80 R System return DN80 mm G Gas supply DN65 F Flue outlet 250 mm W 838 mm L 1630 mm H 1630 mm CONNECTIONS M System ow DN100 R System return DN100 mm G Gas supply DN65 F Flue outlet...

Page 9: ...Heat exchanger 13 Water outlet connection 14 Water ow collector 15 Return water collector 16 Pressure sensor 17 Chassis 18 Fan 19 Flow NTC sensor 20 Limit thermostat 21 Electrical panel 22 Electrical...

Page 10: ...035 7 146 0 1001 8 162 7 1107 6 0 8 6 90 95 97 0 97 3 107 1 107 0 108 0 29 4 33 8 61 9 64 6 9 0 9 3 6 44 7 46 16 29 12 27 9 3 9 3 0 069 0 457 0 068 0 459 15 64 106 97 15 8 107 1 DN 100 DN 100 DN 65 25...

Page 11: ......

Page 12: ...top and rear rear...

Page 13: ......

Page 14: ...Alubox 540...

Page 15: ...Alubox 540 700 gas adjustment points...

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ......

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ......

Page 35: ......

Page 36: ......

Reviews: