background image

Table of Contents

Table of Contents

IMPORTANT

, you are highly recommended to perform the following checks:

When carrying out commissioning of the boiler

– Make sure that there are no liquids or inflammable materials in the immediate vicinity of the boiler.

– Make sure that the electrical connections have been made correctly and the earth wire is connected to a

weel done earthing system.

– Open the gas tap and check the soundness of the connections, including the burner.

– Make sure that the boiler is set for operation for the type of gas supplied.

– Check that the flue pipe for the outlet of the products of the combustion is unobstructed and has been properly

installed.

– Make sure that any shutoff valves are open.

– Make sure that the system is charged with water and is thoroughly vented.

– Check that the circulation pump is not locked.

– Purge the system, bleeding off the air present in the gas pipe by operating the pressure relief valve on the gas

valve inlet.

– The installer must provide the user with instruction in operation of the boiler and safety devices and hand over the

instruction booklet to the user. 

The images shown in this manual are a simplified representation of the product. In this representation there may be 
slight, unimportant differences with the supplied product.

1

Meaning of the symbols and safety instructions   . . 3

1.1

Meaning of symbols

1.2

General warnings  

2

General   . . . . . . . . . . . . . . . . .  . . . . . . . . . . . . . . .  5

2.1

Designated use . . . . . . . . . . . . . . . . . . . . .  5

2.3

Boiler room & ventilation. . . . . . . . . .. . . . .   5

2.2

Description of the appliance  . . . . . . . . . .    5

   . . . . . . . . . . . . . . . . . .   3
 . . . . . . . . . . . . . . . . . . .   3

1.3

Safety instructions  

 . . . . . . . . . . . . . . . . . . .   4

1.4

Regulations and standarts  

               . . . . . . . . . . . .   4

2.4

Packaging label  . . . . . . . . . . . . . . . . . . . . .  6

2.5

Warning label  . . . . . . . . . . . . . . . . . . . . .  .  6

2.6

Data label  . . . . . . . . . . . . . . . . . . . . . . . . .   6

3.1.1 Alubox 540-700  dimensions

               . . . . . . . . . . .  7

3.2      Alubox main components . . . . . . . . . . . . . . .  8

3   Technical features  . . . . . . . . . . . . . . . . . . . . . .  . .   7

3.3     Technical data  . . . . . . . . . . . . . . . . . . . . . . .   9

4.1.1   Packing

 . . . . . . . . . . . . . . . . . . . . . . . .   10

4   Instructions for the installer . . . . . . . . . . . . . . . . . . . 10

4.1

Installation  . . . . . . . . . . . . . . . . . . . . . . . .    10

4.1.2   Transport

 . . . . . . . . . . . . . . . . . . .  . . .    10

4.1.3   Clearances 

 . . . . . . . . . . . . . . . . . . . . .   11

4.1.5   Water side connections

 . . . . . . . . . . . .   12

4.1.4   Water quality and treatment

. . . . . . . . .   11

4.1.6   Expansion vessel

. . . . . . . . . . . . . . . . .   12

4.1.7   Safety valve

 . . . . . . . . . . . . . . . . . . .  .   12

4.1.8   Condansate drain

. . . . . . . . . . . . . . . .    12

4.1.9  Frost protection

 . . . . . . . . . . . . . . . . .   12

4.1.10  Dirt seperation

 . . . . . . . . . . . . . . . . . .   12

4.1.12  Pump

 . . . . . . . . . . . . . . . . . . . . . . . . .   12

4.1.11  Automatic air vent

. . . . . . . . . . . . . . . .   12

4.2  Installation examples

. . . . . . . . . . . . . . . .   13

4.2.1   Single boiler installations

. . . . . . . . . . .   13

4.3    Adjustment of the gas rate

. . . . . . . . . . .   14

4.3.1  Alubox 540-700 adjustment points

. . .   14

4.3.3  Description of the gas valve

 . . . 15

4.3.4  Maximum output adjustment

. . . . . . . . .   16

4.3.5  Minimum output adjustment

  . . . . . . . . .  16

4.4   Gas conversion instructions

. . . . . . . . . . .  16

4.5   Flue installation instructions

. . . . . . . . . . .  17

4.5.1  Flue appliance types

. . . . . . . . . . . . . . .   17

4.5.2  Flue installation types

. . . . . . . . .  . . . . .   17

4.6   Electrical installation 

. . . . . . . . . . . . . . . .  18

4.6.1 Wiring diagram

. . . . . . . . . . . . . . . . . . . .  18

4.6.2  External probe installation

. . . .  . . . . . .   19

4.6.3  Outdoor temperature control

. . . . . . . .    20

5     Operation   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

5.1   General 

. . . . . . . . . . . . . . . . . . . . . . . . . .  21

5.2   Programming

. . . . . . . . . . . . . . . . . . . . .    23

5.3   Error codes

. . . . . . . . . . . . .  . . .  . . . . . .   24

5.4  Maintenance codes

. . . . . . . . . . . . . . . .     25

6     Maintenance    . . . . . . . . . . . . . . . . . . . . . . . . . . .   26

6.1   General 

. . . . . . . . . . . . . . . . . . . . . . . . . .  26

Comissioning checklist

. . . . . . . . . . . . . . . . . .   30

6.2   Maintenance procedure

. . . . . . . . . . . . .    26

Service interval record

. . . . . . . . . . . . . . . . . .    32

6.3   Troubleshooting

. . . . . . . . . . . . . . . . . . .    28

3.1.2 Alubox 1100  dimensions

  . . . . . . . . . . . . . . . . . .  7

4.3.2  Alubox 700 adjustment points

. . .   14

Summary of Contents for Alubox Series

Page 1: ...1015 14 Alubox 540 Alubox 700 Alubox 1100...

Page 2: ......

Page 3: ...General warnings 2 General 5 2 1 Designated use 5 2 3 Boiler room ventilation 5 2 2 Description of the appliance 5 3 3 1 3 Safety instructions 4 1 4 Regulations and standarts 4 2 4 Packaging label 6...

Page 4: ...r authorized quali ed personnel Periodically check that the condensate drain is free of blockages Periodically check that the operating pressure of the water circuit when cold is 1 5 barand less than...

Page 5: ...o the constructive components which in uence the When tightening or loosening the screw connections use only adequate tool The improper use and or the use of inadequate equipment can cause damages If...

Page 6: ...or stored 2 1 DESIGNED TO USE 2 3 BOILER ROOM VENTILATION These installation and maintenance instructions apply to General TheAlubox is a oor standing aluminium condensing boiler for CH and DHW with...

Page 7: ...1015 14 Production year Istanbul Endustri ve Ticaret Serbest Bolgesi FREE ZONE 4 Sok Parsel 110 34957 Tuzla Istanbul TURKEY www gassero com 1015 14 1 1...

Page 8: ...IONS M System ow DN80 R System return DN80 mm G Gas supply DN65 F Flue outlet 250 mm W 838 mm L 1630 mm H 1630 mm CONNECTIONS M System ow DN100 R System return DN100 mm G Gas supply DN65 F Flue outlet...

Page 9: ...Heat exchanger 13 Water outlet connection 14 Water ow collector 15 Return water collector 16 Pressure sensor 17 Chassis 18 Fan 19 Flow NTC sensor 20 Limit thermostat 21 Electrical panel 22 Electrical...

Page 10: ...035 7 146 0 1001 8 162 7 1107 6 0 8 6 90 95 97 0 97 3 107 1 107 0 108 0 29 4 33 8 61 9 64 6 9 0 9 3 6 44 7 46 16 29 12 27 9 3 9 3 0 069 0 457 0 068 0 459 15 64 106 97 15 8 107 1 DN 100 DN 100 DN 65 25...

Page 11: ......

Page 12: ...top and rear rear...

Page 13: ......

Page 14: ...Alubox 540...

Page 15: ...Alubox 540 700 gas adjustment points...

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ......

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ......

Page 35: ......

Page 36: ......

Reviews: