
12
13
STEP 9
a) Insert the pre-attached bolts on the lid handle (A) into the holes on the front of the lid
and seal with one flat washer (HH), one spring washer (GG) and one nut (II).
b) Align the holes on the back side of lid with the holes on the upper hinge (C).
c) Insert one bolt (BB) into each pre-drilled hole and seal with one flat washer (DD),
one spring washer (CC) and one nut (EE).
d) Go back and tighten all the bolts using the screwdriver provided.
BB
M5 X 10 Bolt
2 PCS
DD
Flat Washer
2 PCS
CC
M5 Spring Washer
2 PCS
EE
M5 Nut
2 PCS
HH
Flat Washer
2 PCS
GG
Spring Washer
2 PCS
II
M6 Nut
2 PCS
STEP 10
Insert one lid pin (LL) into each hinge hole and secure with one R pin (KK) as shown.