![Gasboy Islander PLUS Installation Manual Download Page 59](http://html1.mh-extra.com/html/gasboy/islander-plus/islander-plus_installation-manual_3660001059.webp)
Figure 3-4 shows a functional diagram of the links within the Home Base Station with electronic
pumps.
3-3.2. Home Base Station Architecture
The Home Base Station functional architecture consists of the following levels:
•
Main Power Cabinet and Home Base Station forecourt
•
Head Office Center
3-3.2.1. Main Power Cabinet
The Main Power Cabinet includes the following components:
•
Mains Circuit Control Box (MCC)
•
Uninterruptible Power Supply (UPS)
•
TLG Controller
3-3.2.2. Home Base Forecourt
The Home Base Forecourt includes the following components:
•
Islander PLUS/ICR PLUS
•
Dispenser(s) – up to four nozzles for each Islander PLUS/ ICR PLUS. For UL
listing; this product has only been evaluated for use with UL Listed Dispensers.
•
One or more Underground gas tanks
•
TLG probe for each gas tank. For UL listing; this product has only been
evaluated for use with UL Listed TLG’s.
3-3.2.3. Head Office System (Optional)
The Head Office system consists of fully integrated management hardware and software tool that
supports Home Base Station and small gas stations with their sale management of products
including inventory management and reporting.
The Head Office system is a remote control center that stores, processes and analyzes all the
transactions at the Home Base Station. The Head Office Station provides an integrated retail
solution.
Islander PLUS Manual
45
Summary of Contents for Islander PLUS
Page 4: ...This document is the property of ORPAK SYSTEMS Ltd ISRAEL ...
Page 10: ...TABLE OF CONTENTS Paragraph Page INSTALLATION INSTRUCTIONS 127 Islander PLUS Manual vi ...
Page 14: ......
Page 16: ...Figure 1 1 Islander PLUS ICR PLUS General View Islander PLUS Manual 2 ...
Page 26: ...Figure 1 6 Internal Components Location 8 Mechanical Pumps Islander PLUS Manual 12 ...
Page 29: ......
Page 35: ...Figure 1 10 Islander PLUS ICR PLUS Dimensions Islander PLUS Manual 21 ...
Page 41: ......
Page 48: ...Figure 2 4 Conduits Layout for Mechanical Pump Islander PLUS Manual 34 ...
Page 49: ...Figure 2 5 Conduits Layout for Electronic Pump Islander PLUS Manual 35 ...
Page 60: ...Figure 3 2 Home Base Station with 4 Mechanical Pumps System Diagram Islander PLUS Manual 46 ...
Page 61: ...Figure 3 3 Home Base Station with 8 Mechanical Pumps System Diagram Islander PLUS Manual 47 ...
Page 62: ...Figure 3 4 Home Base Station with Electronic Pumps System Diagram Islander PLUS Manual 48 ...
Page 65: ...Figure 3 5 Islander PLUS Terminal Block Power and LAN Connections Islander PLUS Manual 51 ...
Page 81: ...Figure 3 18 Mechanical Pump Single Dispenser Connections Islander PLUS Manual 67 ...
Page 82: ...Figure 3 19 Mechanical Pump Twin Dispenser Connections Islander PLUS Manual 68 ...
Page 87: ...Figure 3 23 Islander PLUS Terminal Block Wiring List Label Islander PLUS Manual 73 ...
Page 93: ...Figure 3 29 Journal Printer Rear Panel Islander PLUS Manual 79 ...
Page 134: ...Islander PLUS Manual 120 ...
Page 136: ...Figure B 1 Islander PLUS Wiring Diagram Mechanical Pump Islander PLUS Manual 122 ...
Page 137: ...Figure B 2 Islander PLUS Wiring Diagram Electronic Pump Islander PLUS Manual 123 ...
Page 138: ...Figure B 3 Islander PLUS for 8 hoses Wiring Diagram Islander PLUS Manual 124 ...
Page 140: ...Figure 1 HID Unit and Connector Figure 2 HID Holder and Nuts Islander PLUS Manual 126 ...
Page 146: ...Figure 11 Placing Hand Tag Label on Pedestal Islander PLUS Manual 132 ...