Magnum 6KL Managed Edge Switch Installation and User Guide
11/09
iv
www GarrettCom com
.
.
5.1.11
6KL4-2MSC2RJ, 6KL4-2MST2RJ (Slot C) ............................. 37
5.1.12
6KL4-2SSC2RJ (Slot C) ............................................................ 38
5.1.13
6KL4-2SL2MLC, 6KL4-1SL3MLC (Slot C) ............................ 38
5.1.14
6KL4-1ML1SLC2RJ (Slot C) .................................................... 38
5.1.15
6KL4-1MLC3RJ, 1 x LC Multimode / 3 x RJ45 (Slot C) ......... 39
5.1.16
6KL4-1SLC3RJ, 6KL4-1SLCL3RJ (Slot C) ............................. 39
5.1.17
6KL4-1MT3RJ, 1 x MTRJ Multimode / 3 x RJ45 (Slot C) ....... 39
5.1.18
6KL1-1MLC, -1SLC, -1SLCL, 1 x LC (Slot C) ........................ 39
5.1.19
6KL1-1MT, 1 x MTRJ Multimode (Slot C) .............................. 39
5.1.20
P6KL4-RJ45, 4 x PoE RJ45 (Slot C) ......................................... 40
5.1.21
6KL-2GCU, 2 x Gigabit RJ45 (Slot B) ...................................... 41
5.1.22
6KL-2GSFP, 2 x Gigabit SFP (Slot B) ...................................... 41
6.0
TROUBLESHOOTING
...................................................................... 42
6.1
Before Calling for Assistance ............................................................ 42
6.2
When Calling for Assistance ............................................................. 42
6.3
Return Material Authorization (RMA) Procedure ............................. 43
6.4
Shipping and Packaging Information ................................................. 44
APPENDIX A: WARRANTY INFORMATION
.......................................... 44
APPENDIX B: DC Power Input
..................................................................... 45
APPENDIX C: Internal DC Dual-Source Power Input Option
.................. 48
APPENDIX D: Field Installation instructions for Slot C module
............... 51
Revisions:
Rev. E 11/09
:
Updated Copper Gigabit Port LED designations (pg. 31)
Rev. D 10/09
:
Updated Sec. 1.1 (pg. 2) and Sec. 3.2 (pg. 18) to include SC
and ST fiber connectors
Rev. C 10/09
:
Added photos to Appendix D
Rev. B 09/09
:
Added additional module options,
changed Copper Gb LED configuration, see 5.1.1
Rev. A 07/09
: Initial
Release