4
EN
353116
G L B - T 2 2 2 W
O
2 3 0 /4 0 0 V 3 2 A 5 0 H z
IP 4 4 E N 6 1 8 5 1 - 1 IE C 6 1 4 3 9 - 7 A E V C S
SN : 5 0 2 2 2 5 4
B O X 2 0 3 , 3 3 5 2 5 G N O SJ Ö , SW
E
EN
GARO Wallbox
Assembly instructions/User Instructions (EN)
380175-3
Box content
Language
labels
GLB Wallbox
Keys
Drill template
(see the back of the box)
Manual
Tools and materials required
Type Label example
GLB Type
Important information
ASSEMBLY INSTRUCTIONS
Mandatory: Supply cable, 1-phase or 3-phase depending on GLB
model
Cable entrance from bottom side
Custom (only when extra functions in use):
• Twisted pair cable for Modbus energy meter
• Twisted pair cable for Datalink communication
• 2-wire signal cable for remote control function
• TP Cat6 for LAN connection
Before installing the Garo GLB-Wallbox, gather the following tools
and materials:
• Pen or marker
• Hole punch (optional, to push through cardboard template)
• Wire cutter
• Voltmeter or digital multimeter (to measure AC voltage at the
installation site)
• Small flathead screwdriver
• Medium flathead screwdriver
• Large flathead screwdriver (optional, to remove plastic knock-
outs on backside of GLB Wallbox)
• T20 Torx driver
• 3 screws (and plugs) suitable for wall type
• Ferrules (the diameter of the ferrule depends on the diameter of
the power wiring and the construction)
• Level
• Power drill
• Twisted pair cable (Optional only when DLM is used) Cable:
Suitable for Modbus communication.
• Cable gland for communication cable (Optional only when
knock-outs on backside of GLB Wallbox is used)
The GARO GLB Wallbox is an AC charge-station enabling Mode
3 charging which complies fully with the requirements of IEC
61851-1 and IEC TS 61439-7. The product complies with IP
Code IP44, with a closed front.
It is to be fitted to a wall or GARO Wallbox stand, and all
installation must be carried out by an authorized installer and
comply with local country installation regulations.
Assembly instructions