![Garland MSTSR16-280 Installation And Operation Manual Download Page 12](http://html1.mh-extra.com/html/garland/mstsr16-280/mstsr16-280_installation-and-operation-manual_3717939012.webp)
Part # P143 (11/10/08)
Page 12
CONVERSION INSTRUCTIONS
Servicing must be carried out by a competent person in
accordance with the law .
WARNING: Turn off the gas supply to the appliance at the
service cock before commencing any servicing work .
IMPORTANT: Test for gas soundness on completion of any
servicing work .
The following instructions are intended to describe the
operations necessary to convert equipment from operation
on one gas family to that of another .
1 . Ensure that all of the parts necessary to make the
conversion have been supplied as follows:
a . Injector fittings (One required for each main burner) .
b . Pilot injector fittings (One required per pilot burner) .
c . Gas adjustment label (One required per unit) .
If any of the required parts are missing, contact your Garland
dealer before attempting to carry out the conversion .
NOTE: Conversion kits supplied for G31 gas will contain
redundant fittings and markings covering both 37 mbar & 50
mbar gas supplies .
2 . Remove the burners following the instructions given in
this manual .
3 . Replace each injector fitting with the new fitting that is
supplied .
NOTE: Before doing so, refer to Table D (Table G for Australian
Models) in this manual to ensure that the correct injector has
been supplied for the gas supply being converted to .
4 . Replace each pilot injector fitting with the new fitting
supplied .
Ensure that you have the correct pilot injector before
replacing .
Upon completion of all the above operations, follow the
section in the manual on “Commissioning” and ensure
that the setting pressure and all burner flame settings are
adjusted accordingly .
Continuous product improvement is a Garland policy,
therefore specifications and design are subject to change
without notice .