
Varsity Jam Adjustable Basketball System
6
INSTALLATION
Tools and Materials Required for Assembly:
1.
(2) 12” Adjustable Wrenches.
2.
Socket Set with
9
/
16
”, ¾” sockets
3.
9
/
16
” & ¾” End Wrench
4.
Tape Measure
5.
Hammer or Rubber Mallet
6.
Shovel
7.
Post Hole Digger.
8.
Carpenter’s Level
9.
(2) Heavy Duty Step Ladders
10.
(2) Sawhorses
(For Optional Board Padding)
11.
Phillips Head Screwdriver
12.
Electric Drill,
13.
11/64” Drill Bit
Materials Required for Assembly:
1.
Concrete –1/2 yard or 15-16 bags of pre-mix (80 lb. bags)
2.
(1) 2” x 4” x 8ft for forms.