
Varsity Jam Adjustable Basketball System
13
Install Upper Arms
6.
Attach Upper Arms, #33, to the Upper Arm
Pivot in the Post Weldment, #9, using ½” x
9” Bolt, #14, and hardware indicated. Allow
arms to swing vertically down at this time.
Tighten Lock Nut, #20, to remove
clearance only.
Do not torque
.
Prepare Board for Installation
1.
Support Backboard on (2) sawhorses with the goal side down. Use cardboard packing
material under board face to prevent scratching glass and frame