
Varsity Jam Adjustable Basketball System
12
Install Lifting Arm and Actuator
1.
Attach the Lifting Arm, #31, to the Post
Weldment using ½” x 10” Bolt, #15, and
hardware indicated. Allow Lifting Arm to
rest on Arm Stop when bolt is inserted.
Tighten Lock Nut to remove clearance
only.
Do not torque
.
2.
Attached upper end of Actuator, #6, to
Lifting Arm using Tube, #10 and ½” x 10”
Bolt, #15, with hardware indicated. Tube
should pass through both the hole in the
plastic rain sleeve and the hole in the
Actuator. Tighten Lock Nut, #20, to
remove clearance only.
Do not torque
.
3.
Attach the Actuator Anchor Plates, #11, to
the Post Weldment using ½ x 1 ¼” Bolts,
#16, and hardware shown. Tighten bolts.
4.
Attach the Crank Handle and crank the
Actuator clockwise to lengthen it until the
crank end can be attached to the Anchor
Plate, #11 on the Post Weldment using a ½” x
5” Bolt, #19, and hardware as indicated.
Tighten Lock Nut, #20, to remove clearance
only.
Do not torque
.
5.