background image

 

  

All

 

Pro Jam Adjustable Basketball System 

   

 

 

 

PARTS CHECKLIST

 

 

Your unit should be shipped with the following packages.  Be sure that all packages and parts are 
received before proceeding with installation.  Please refer to your packing slip to verify the 
correct board and goal has been received. Contact Gared Customer Service at 

800-325-2682 or 

PSS Customer Service at 800-848-8034 for assistance with replacement of any parts missing or damaged. 

 

453072576  POST PKG, GP12-DM 

ITEM

QTY

PART NUMBER DESCRIPTION

1

4

103055665

WASHER,FLAT .66 X 1.31 X .06 DELRIN BLK

2

1

123051518

DECAL, WARNING GP SERIES

3

1

153055631

BASE HARDWARE KIT W/ TEMPLATE PL.

4

1

451652530

ACUATOR ASSY, GP SERIES

5

4

451652565

REBAR, 1/2 X 36"' LONG

6

1

453072558

MAST WELDMENT, GP12

7

1

502-10-11-88 HEX BOLT, 5/8-11 UNC X 5.5

8

1

545-10-11

HEX NUT, NYLON LOCK 5/8-11

9

2

561-10

FLAT WASHER 5/8

10

1

453072562

CAP, END  6x8"  RECT POST  BLK

 

 

MODEL

POST PKG

ARMS PKG

BOARD

GOAL

BASE

POLE

BOARD

GP12G72DM

453072576

453072577

BB72G50HH

2000

BP8SQ

PP8SQF or PP8WR

LSCE72

GP12A72DM

453072576

453072577

BB72A38

2000

BP8SQ

PP8SQF or PP8WR

LSCE72

GP12P72DM

453072576

453072577

BB72P50

2000

BP8SQ

PP8SQF or PP8WR

LSCE72

OPTIONAL PADS

Summary of Contents for GP12G72DM

Page 1: ...2G72DM GP12A72DM GP12P72DM Installation Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTUR...

Page 2: ...ase do not substitute for factory parts Please contact your dealer or Gared or Performance Sports Systems customer service department and allow them to determine if substitute parts are acceptable It...

Page 3: ...the following warnings to prevent possible personal injury and potential damage to the equipment during assembly setup and operation Before proceeding with assembly read all instructions and assembly...

Page 4: ...All Pro Jam Adjustable Basketball System 3 SPECIFICATIONS MODEL GP10G72DM GP10A72DM GP10P72DM Backboard 1 2 GLASS 3 8 ACRYLIC 1 2 POLYCARB Weight lb kg 503 228 449 204 459 208...

Page 5: ...DESCRIPTION 1 4 103055665 WASHER FLAT 66 X 1 31 X 06 DELRIN BLK 2 1 123051518 DECAL WARNING GP SERIES 3 1 153055631 BASE HARDWARE KIT W TEMPLATE PL 4 1 451652530 ACUATOR ASSY GP SERIES 5 4 451652565...

Page 6: ...31 4 453075000 CAP END 1 X 2 TUBE BLK 32 1 453102433 TUBE ARM PIVOT DS 33 6 453102434 FLANGE BUSHING NON METALLIC 16mm 34 2 501 6 16 16 BOLT CARRIAGE 3 8 16 UNC X 1 35 1 502 10 11 160 HEX BOLT 5 8 11...

Page 7: ...le Wrenches 2 9 16 11 16 15 16 1 1 8 Wrench 3 Phillips Head Screwdriver 4 Electric Drill 5 11 64 Drill Bit 6 Tape Measure 7 Rubber Mallet 8 Shovel 9 Post Hole Digger 10 Carpenter s Level 11 2 Ladders...

Page 8: ...asketball System 7 Template Plate Assembly Use the illustration below to assemble the template plate and U bolts Step 3 Securely tighten the top nuts against the plate Step 2 Insert the U bolts up thr...

Page 9: ...All Pro Jam Adjustable Basketball System 8 Use the illustration below to dig and prepare the hole for anchoring the template plate U bolt assembly This hole is designed to use 1 2 yard of concrete...

Page 10: ...ncrete as shown in the illustration Agitate the Template plate and U bolt assembly repeatedly to eliminate air bubbles in the concrete Make sure the template plate is resting on the level and finished...

Page 11: ...post over the U bolts as shown below The post is heavy so use at least two people for this operation Be sure that the post is installed with the Actuator Anchor on the side away from the court 4 Secur...

Page 12: ...See the instructions on the following pages for more detailed information 1 Install 16mm Flanged Bushing 33 into Upper Arm Pivot Lifting Arm Pivot and Actuator Pivot Tubes 32 Bushings are designed to...

Page 13: ...e Lifting Arm Weldment 26 Install with flange side against Lifting Arm 4 Attached upper end of Actuator 4 to Lifting Arm using Tube 32 and hardware indicated Tube should pass through both the hole in...

Page 14: ...nd hardware indicated There are different size holes in each end of the arm Use the larger 5 8 diameter hole Allow arms to swing vertically down at this time Prepare Board for Installation 1 Support B...

Page 15: ...gain access to Goal mounting hardware Attach Goal to front side of Board using 3 8 hardware and instructions provided with goal 3 Attach Upper Board Brackets 30 to the inside of Backboard frame as sh...

Page 16: ...d on each side of the Lifting Arm rod 2 Lift the Backboard Assembly and hook the Board Mounting Bracket 28 onto the Lifting Arm rod as shown Be sure that the Bushing Flange stays to the inside of the...

Page 17: ...he Backboard in a vertical position swing the upper arms up to meet the Upper Board Attaching Brackets 30 and attach using 7 16 x 2 Bolts 39 and hardware as indicated 5 Snug all 7 16 Bolts to remove c...

Page 18: ...t 34 and the 3 8 goal hardware Level board and retighten Whiz Lock Nuts 2 Check the level of the Goal from side to side If adjustments need to be made loosen the 4 3 8 goal nuts Level Goal and retight...

Page 19: ...f tape mark the location of the lower edge of the rain shield 2 Crank the Goal to the minimum height so that the Lifting Arm rests on the stop Crank clockwise to lower 3 Apply Height Adjusting Decal 2...

Page 20: ...All Pro Jam Adjustable Basketball System 19 Installing Optional Padding Note The padding options shown below are purchased separately...

Page 21: ...e Basketball System 20 The following illustration shows how to attach the optional LSCE72 Pro Mold Recreational Backboard Padding if purchased The padding may be attached before or after the backboard...

Page 22: ...red Holdings LLC Performance Sports Systems Gared Sports 9200 E 146th Street 707 North 2nd Street Noblesville IN 46060 St Louis MO 63102 800 848 8034 800 325 2682 www perfsports com www garedsports co...

Reviews: