All
Pro Jam Adjustable Basketball System
15
Install Board
The Board, Goal, and Brackets can weigh
nearly 185 lbs. Make sure that you have
enough help to complete this operation safely!
1.
Be sure that the 5/8” Flanged
Bushing, #48, has been
installed on each side of the
Lifting Arm rod.
2.
Lift the Backboard Assembly
and hook the Board Mounting
Bracket, #28, onto the Lifting
Arm rod as shown. Be sure
that the Bushing Flange stays
to the inside of the Mounting
Board Bracket.
*Helpful hint;
Working out of the
bed of a truck may be easier than
using ladders. The backboard is
very heavy.
3.
Continue holding board in a vertical
position and install the ½ x 8” Bolt,
#48, Flat Washer and Lock Nut as
shown.