background image

 

  

5100 OmniSteel™ Volleyball System

   

 

 

Set-up Guide 

 

 Parts Checklist 

 

Verify all parts listed on packing list are present prior to installation. 

 

Floor Sleeves/Covers Plates (These may ship early and separately) 

 

-Floor Sleeves                                 OK 

 

-Cover Plates                                   OK 

 

Upright Posts (Refer to drawings or pictures in the instructions) 

 

-End Post(s)                                     OK 

 

-Winch Post(s)                                 OK 

 

Net/Cable Hardware 

-Cable                                              OK 

 

-Winch (es) & Hardware                 OK 

 

-Antenna(s)                                      OK 

 

-Net(s)                                              OK 

 

Padding 

-Upright Pads                                   OK 

 

-Chain & Cable Covers                    OK 

 

Optional Accessories 

-Referee Stand                                 OK 

 

-Equipment Cart                              OK 

 

-Storage Devices                             OK 

 
 
 
 
 
 

Summary of Contents for OmniSteel 5100

Page 1: ...eyball System Installation Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE PUBLICA...

Page 2: ...el Volleyball System 1 Table of Contents Section Page No Introduction 2 Parts Checklist 3 Floor Sleeve Installation 4 5 Floor Cover Installation 6 Net Installation Instructions 7 9 Maintenance and Che...

Page 3: ...ball system To prevent normal wear and tear from shortening the life of the unit preventative maintenance inspections and repairs should be performed at least once per year If the units are subject to...

Page 4: ...lates These may ship early and separately Floor Sleeves OK Cover Plates OK Upright Posts Refer to drawings or pictures in the instructions End Post s OK Winch Post s OK Net Cable Hardware Cable OK Win...

Page 5: ...our the grout mixture into the hole until it is just below the BOTTOM of the concrete hole Cover the sleeve during installation to prevent debris from falling into it or grout from entering bottom of...

Page 6: ...5100 OmniSteel Volleyball System 5 Installation Instructions for Ground Sleeves...

Page 7: ...5100 OmniSteel Volleyball System 6 Counterbore Details and Floor Cover Installation...

Page 8: ...ckwise to tighten the net Turn the handle counter clockwise to loosen the net 5 The height of the net will vary with the tightness of the cable Minor height adjustments can be made by screwing the foo...

Page 9: ...5100 OmniSteel Volleyball System 8 Details Winch Post with Net...

Page 10: ...5100 OmniSteel Volleyball System 9...

Page 11: ...components and straps for wear Maintenance Check Sheet Date Unit Anchors Floor Sleeves Anchors bolts OK Repair Replace Floor sleeves covers OK Repair Replace Unit Supports Brackets Hinges Tubes dents...

Page 12: ...red Holdings LLC Performance Sports Systems Gared Sports 9200 E 146th Street 707 North 2nd Street Noblesville IN 46060 St Louis MO 63102 800 848 8034 800 325 2682 www perfsports com www garedsports co...

Reviews: