5100 OmniSteel™ Volleyball System
10
Maintenance
1.
General inspection of equipment when used should be performed to ensure no
catastrophic failures have occurred during the course of use between yearly
inspections.
2.
It is recommended that yearly inspections be conducted to determine if any bolts
or any other hardware has become worn or loosened. A sample check sheet has
been provided for you in this guide.
3.
During yearly inspections, all moving parts should be inspected while in
operation. Key points to look for include rotation points where bushings contact
metal, winches, and pulleys.
4.
Any loose bolts or nuts should be tightened.
5.
Check sliding components and straps for wear.
Maintenance Check Sheet
Date: Unit: .
Anchors/Floor Sleeves
-Anchors/bolts OK Repair Replace
-Floor sleeves/covers OK Repair Replace
Unit Supports / Brackets / Hinges
-Tubes; dents, stress spots, etc. OK Repair Replace
-Bolts; loose, deformed, etc. OK Repair Replace
-Brackets/Hinges; bent, not rotating, etc.
OK Repair Replace
Winch/Strap
-Winch; binding, loose, etc. OK Repair Replace
-Hardware; Quick links OK Repair Replace
Sliding Components
-Locking Mechanisms OK Repair Replace
Safety Padding
-Velcro Function OK Repair Replace
-Vinyl Condition OK Repair Replace
Replacement parts and / or service to the equipment can be obtained from your local PSS or
Gared dealer or installer. To find your local PSS or Gared dealer, visit us online or contact
customer service department at the web address or phone number listed on the last page of this
manual.
Summary of Contents for OmniSteel 5100
Page 6: ...5100 OmniSteel Volleyball System 5 Installation Instructions for Ground Sleeves...
Page 7: ...5100 OmniSteel Volleyball System 6 Counterbore Details and Floor Cover Installation...
Page 9: ...5100 OmniSteel Volleyball System 8 Details Winch Post with Net...