5100 OmniSteel™ Volleyball System
2
Introduction
Thank you for your purchase of a Gared Sports OmniSteel™ Volleyball System. To
ensure that our equipment will provide years of use to you, we are including this installation,
operation, and maintenance guide. This guide will provide information on the proper assembly
and installation methods, operating procedures, and preventative maintenance of your volleyball
system.
Please note that a Bill of Materials is being included with this guide. Please check that all
of the parts called out on the Bill of Materials are present prior to beginning assembly and setup.
Please do not substitute for factory parts. Please contact the PSS or Gared Sports customer
service department and allow them to determine if substitute parts are acceptable.
It is recommended that an individual who has been properly trained perform the
installation operation of the volleyball system.
To prevent normal wear and tear from shortening the life of the unit, preventative
maintenance inspections and repairs should be performed at least once per year. If the units are
subject to high or unusual usage, inspections should be scheduled to occur more frequently. If
items are found to be nonconforming, replacements can be ordered from PSS or Gared Sports or
one of our authorized dealers. When contacting PSS or Gared Sports, please have information
regarding the dealer/installer who sold the unit, the name of the project, and any applicable
warranty information
PARTS LIST BY SUB ASSEMBLY
PART NO.
DESCRIPTION
QTY.
6252
CABLE COVER SET
1 EACH
6404
FLOOR SLEEVE 3-1/2” O.D. X 9.0” TALL
2 EACH
1028-22-00
NET ANTENNA
1 PAIR
6430
6” BRASS FLOOR COVER
2 EACH
5106
3” STEEL VOLLEYBALL WINCH POST
1 EACH
5107
3” STEEL VOLLEYBALL END POST
1 EACH
7607-22-00
NET SIDELINE MARKER
2 EACH
601654708
VOLLEYBALL NET
1 EACH
Note: Number 6404 & 6430 are normally shipped early.
Sleeve and floor covers are shipped early to be installed at time of
original construction. Posts are shipped fully assembled.
Summary of Contents for OmniSteel 5100
Page 6: ...5100 OmniSteel Volleyball System 5 Installation Instructions for Ground Sleeves...
Page 7: ...5100 OmniSteel Volleyball System 6 Counterbore Details and Floor Cover Installation...
Page 9: ...5100 OmniSteel Volleyball System 8 Details Winch Post with Net...