![Gardner Denver L55 User And Service Manual Download Page 52](http://html1.mh-extra.com/html/gardner-denver/l55/l55_user-and-service-manual_3819987052.webp)
50
August 20, 2018
Fig. 23
Check the control transformer setting as follows:
·
Switch the unit on as described in Chapter 8.4.
·
Check the control transformer output voltages while
operating under load. Several tapping points are
provided for this purpose (see circuit diagram).
·
Switch the unit off as described in Chapter 8.6.
Change the control transformer setting as follows,
if the output voltage is not correct:
·
Change the control transformer setting accordingly.
·
Set the on-site main switch to
“0”(OFF) and secure
it against being switched on.
·
L55RS-L75RS: wait 10 minutes before touching
electrical components. The power capacitors need
this time to discharge.
·
Change the control transformer setting. Fig. 13
illustrates an example.
·
Then, check the setting again.
Summary of Contents for L55
Page 2: ......
Page 27: ...August 20 2018 25 Fig 5...
Page 62: ...60 August 20 2018 Fig 29 all dimensions in mm...
Page 63: ......