1. Insert one T-section (part 4) into one end of
each top rail section (part 3). Ensure the hole
in the T-section matches the hole in the rail.
Use a rubber mallet if necessary. Use the
spring hook tool to help spread the T-section if
required. Repeat for the other T-sections, but
do not connect the top rail sections together
as yet.
2. Fit the leg tubes (part 6) onto the T-sections
using the spring hook tool to compress the T-
section. please note the orientation of the leg
tubes is important. The T-sections must be
fitted to the wider end of the leg tubes. Take
care not to pinch your fingers when
compressing the T-sections.
3. Connect 2 top rail sections together. Repeat
for the other top rail sections as shown in Fig
3.