
G
AMATRONIC
E
LECTRONIC
I
NDUSTRIES
L
TD
.
48
P+ PREMIUM 60, Installation Guide,
rel.
1.4
5.
Loosen the two screws that secure the module to the UPS frame – one screw on each side of the
module face.
6.
Grip the module by the handle on the front face of the module and pull the module out, gently but
firmly.
7.
The
Power+ Premium 60
controller must be informed that a module has been removed from the
system. On the LCD control panel, from the main menu navigate to
"Setup > System > Number of modules". Decrease the total number of modules by one. Depending
on your configuration you may also need to decrease the number of redundant modules by one.