h) Install the probe of control of temperature TCS
between the last stretch of hose of product and
the final stretch connected to the gun. Stretch
carefully the cable of the probe inserting it in the
Isocyanate hose.
i)
Wind the connector of the probes to the
connector of the hose. Realize so many
connections as stretches of 15 m hose you have.
j)
Realize the connections between the connector
of exit of the probe TCS of the first stretch of
hose and the connector proceeding from the
machine.
k) As soon as the connections were completed,
place the protections for the union fixing them
with three plastic bridles. Later cover the union
with the ends of the cases.
NB:
To protect the TCS sensor, you must pay special attention not to kink or
excessively bend the hoses. Do not roll up the hoses with a radius of under one meter / 4
feet.
l)
Connect the air hoses.
m) Connect the hoses to the connectors of the coupling block of the gun, making sure that
the manual valves are closed.
Having performed the above operations, you must note the direction in which the motor turns.
To make sure that it is turning clockwise, do the following:
a) Turn the hydraulic pressure regulator counter clockwise.
b) Turn the general switch ON. The top pilot light will come on.
c) Press the POWER CONTROL key.
d) Go to the side of the machine to be able to see the motor fan. Press the MOTOR key to
start the motor and press it again to stop it. Check that the blades of the fan are turning
clockwise, otherwise turn the general switch OFF and disconnect the unit from the
source of electrical supply.