LCP
RG66006889-Rev.01 3
CONTENTS
PAGE
1
THE SERIES
6
2
FIELD OF APPLICATION
11
3
GENERALITIES
11
4
INSPECTION, CONVEYANCE, SITING
12
4.1
INSPECTION
12
4.2
LIFTING AND CONVEYANCE
12
4.3
UNPACKING
13
4.4
SITING
13
5
INSTALLATION
14
5.1
INSTALLATION CLEARANCE REQUIREMENTS
14
5.2
GENERAL GUIDELINES FOR PLUMBING CONNECTIONS
15
5.3
WATER CONNECTION TO THE EVAPORATOR
16
5.4
SAFETY DEVICES ON THE HIGH PRESSURE SIDE
17
6
ELECTRICAL CONNECTIONS
18
6.1
GENERALITIES
18
6.2
ELECTRICAL CONNECTIONS OF WATER VANE OPERATED FLOW SWITCH
19
6.3
ELECTRIC CONNECTIONS OF THE CIRCULATION PUMP
19
6.4
REMOTE CONTROLS
19
6.5
REMOTE SUMMER-WINTER SWITCHING
19
7
STARTING UP
20
7.1
PRELIMINARY CHECKS
20
7.2
STARTING OPERATION
21
7.3
CHECKS DURING OPERATION
22
7.4
CHECKING THE REFRIGERANT LEVEL
22
7.5
EXPANSION VALVE (OPTIONAL)
23
7.6
STOPPING THE UNIT
24
8
OPERATING LIMITS
24
8.1
WATER FLOW TO EVAPORATOR
24
8.2
CHILLED WATER TEMPERATURE
25
8.3
OUTDOOR AIR TEMPERATURE
25
8.4
OPERATION WITH WATER AT LOW TEMPERATURES
25
9
SETTING OPERATING PARAMETERS
25
9.1
GENERALITIES
25
9.2
MAXIMUM PRESSURE SWITCH
26
9.3
MINIMUM PRESSURE SWITCH
26
9.4
SERVICE THERMOSTAT
26
9.5
ANTIFREEZE THERMOSTAT
27