Chapter 2 Hardware Installation
Hardware Installation
2-15
Step 6.
Use the included crosshead round screws (#9 in the packing
list) to secure two (2) end brackets (#3 or #4) to the back of the
subsystem.
Figure 2-11: Attaching End Brackets to the Rear Side of Enclosure
Step 7.
Gently slide the subsystem into the rack by aligning the tips of
the end brackets with the support brackets. Carefully rest the
tips of the end brackets onto the support brackets and slide the
chassis forward.
Step 8.
When the chassis is inserted towards the end of the rack, the
recessed parts of end brackets should engage the two rivets on
the support brackets. Once the enclosure reaches the end,
proceed with securing the chassis through the mounting holes
on the forearm handles.
Figure 2-12:
Installing Enclosure
Step 9.
Slide the subsystem in as far as it will go, then secure the
system using four (4) pan head screws (see #5 in the packing
Summary of Contents for GHDX2-2430R-24F4D
Page 15: ...Galaxy Raid Installation and Hardware Reference Manual xv ...
Page 32: ...Chapter 1 Introduction 1 17 This page is intentionally left blank ...
Page 61: ...Chapter 3 Subsystem Monitoring System Monitoring 3 5 Figure 3 3 LCD Panel LEDs ...
Page 119: ...Appendix A Subsystem Specifications Specifications A 7 This page is intentionally left blank ...
Page 127: ...Appendix C Pinouts Pinouts C 5 Figure C 4 Connector Pinouts Adapter Cable for COM2 ...