background image

Screw the two upper fixing screws into 
position leaving the base of the screw 
heads protruding 6mm (0.25in) out from 
the wall. Hook the backplate over the top 
screws and fit the lower fixing screw into 
position. DO NOT fully tighten the screws 
at this stage, as the fixing holes are 
elongated to allow for out of square 
adjustment after the plumbing connections 
have been completed.

10

SECTION

PLUMBING CONNECTIONS

PLUMBING TO PRECEDE WIRING

WARNING: 

The outlet of the shower acts 

as a vent and must not be connected to 
anything other than the hose and 
sprayhead supplied.

GALAXY ‘AQUA 9000 XP’

FIXING TEMPLATE

V

E

R

TI

C

AL
 C
EN

T

R


L

IN

E

HORIZONTAL CENTRE LINE

Fig.9

     DO NOT

 

use jointing compounds on 

     any pipe fittings for the installation. 

     DO NOT

 

use soldered fittings within 

     the vicinity of the shower unit.

NOTE:

 An additional gate valve or fullway 

lever valve must be fitted in the water 
supply to the shower as an independent 
means of isolating the water supply should 
maintenance or servicing be necessary.

IMPORTANT: 

The fitting on the inlet elbow 

is a push-in type. The pipework must be 
cut with a pipe cutter and all burrs and 
rough edges removed from the end of the 
tube. The fitting can be used with copper 
and plastic pipe. If using chrome plated 
copper pipe, remove the first 25mm of 
plating completely from the connecting 
surface. If it is not completely removed 
then the collet will not grip the pipe and
under pressure the pipe may be forced 
out.

CONNECTION PROCEDURE: Turn off 
water supply either at the mains stopvalve 
or the isolating stopvalve to the cistern. 
Drain the cistern.

IMPORTANT: 

T

he pipework must be 

brought direct from the Cold water storage 
cistern with no other Cold water draw offs 
between the shower and the cistern.

IMPORTANT: Before completing the 
connection of the water supply to the 
inlet of the shower, flush out the 
pipework to remove all swarf and 
system debris. This can be achieved by 
connecting a hose to the pipework and 
turning on the water supply long 
enough to clear the debris to waste.

Fit the pipework to the inlet elbow. Ensure 
the elbow collet is fully engaged with the 
pipe. Although the pipework connection to 
the shower is via 15mm diameter 
pipework, on long runs use 22mm 
diameter piping as far as possible to avoid
restricting the flow to the shower.

Ensure that the backplate of the unit is flat 
on the wall and positioned squarely. 
Tighten the fixing screws.

Turn on the water supply and check for 
leaks in the pipework connection to the 
shower. 

NOTE:

 At this stage no water can 

flow through the unit. 

11

SECTION

ELECTRICAL 
CONNECTIONS

SWITCH OFF THE ELECTRICITY 

SUPPLY

The cable entry points are shown in 

(Fig. 10).

The cable can be surface clipped, hidden 
Or via 20mm conduit. NOTE: Metal 
conduit entry can only be from rear.

Route the cable into the shower unit and 
connect to the terminal block 

(Fig. 11) 

As 

Follows:-

Earth cable to terminal marked ......

Neutral cable to terminal marked ...

N

Live cable to terminal marked.........

L

E

IMPORTANT: Fully tighten the terminal 
block screws and ensure that no cable 
insulation is trapped under the screws. 
Loose connections can result in cable 
Overheating.

.

Fig.11

NOTE: The supply cable earth conductor 
must be sleeved. The outer sheath of the 
supply cable must be stripped back to the 
minimum. The supply cable must be 
secured either by routing through conduit 
or in trunking or by embedding in the wall, 
in accordance with current IEE regulations.

The use of connections within the unit, or 
other points in the shower circuit, to 
supply power to other equipment i.e. 
extractor fans, pumps etc. will invalidate 
the guarantee.

DO NOT switch on the electricity 
supply until the cover has been fitted.

Fig.10

12

SECTION

COMMISSIONING

DO NOT switch on the electricity 
supply until the following procedure 
has been completed and the cover has 
been fitted. Failure to do so could 
Cause the pump to run dry and
invalidate the guarantee.

Cold position must be selected on 
power selector (Fig.14) Before carrying 
out any of the steps below. Failure to 
do so 

WILL

 cause the heating 

Summary of Contents for Aqua 9000 XP

Page 1: ...ower rating serial number and date of purchase The Galaxy Technical Hotline will be able to inform you whether the fault can be rectified by the provision of a replacement part or an on site visit by...

Page 2: ...ructions Any component found to be defective during this period as the result of misuse or damage or the effects of scaling will not be covered by this guarantee with the exception of si Scalemaster m...

Page 3: ...ness is sufficient 6 Al plumbing connections MUST be completed BEFORE making the electrical connections ELECTRICAL 1 The installation must comply with BS 7671 Requirements for electrical installations...

Page 4: ...5kW 40A MCB rating 9 5kW 40A MCB rating Nominal power rating at 230V 8 5kW 40A MCB rating 9 5kW 40A MCB rating The following points will help you understand how the shower operates A The electric heat...

Page 5: ...0 08 METRES RATING 20 MINS ON 60MINS OFF RATED PRESSURE 0 Pa THIS SHOWER UNIT WILL NOT EXCEED A FLOW RATE OF 20 LPM GALAXY SHOWERS COVENTRY UK REGISTERED DESIGN Model AQUA 9000XP 8 5KW 240V IPX4 SERI...

Page 6: ...uit protection See table B 19 To obtain full advantage of the power provided by the shower use the shortest cable route possible from the consumer unit to the shower 20 It is also necessary to satisfy...

Page 7: ...MUST be positioned vertically 7 SECTION SITING OF THE SHOWER Fig 2 CAUTION Check there are no hidden cables or pipes before drilling holes for wall plugs Exercise great care when using power tools nea...

Page 8: ...cover and subsequent operation of the unit may be impaired Fig 3 Fig 4 COLD position and the temperature control is at TEMPERATURE Replace the cover squarely to the backplate and guide into position s...

Page 9: ...rst operation of the shower is intended to flush out any remaining unit debris and to ensure the heater unit contains water before the elements are switched on This operation must be carried out with...

Page 10: ...connecting a hose to the pipework and turning on the water supply long enough to clear the debris to waste Fit the pipework to the inlet elbow Ensure the elbow collet is fully engaged with the pipe A...

Reviews: