4.1 Prior to Installation
Models with connection to mains water supply
Models with internal Water Tank
4.2 Installation
Once the machine has been unpacked, the following steps should be performed:
Check that the electricity supply voltage is the same as that listed on the specification
plate and in the machine’s
documentation.
Verify before Installing:
1. Grounded plug protected with a magneto-thermic
circuit breaker
Installation and Start-Up
4.
Verify before Installing:
1. Drainage tube with an interior diameter no less
than 35 mm.
2. Mains water network supply tube connected to
water softener.
3.
Stopcock with 3/8” G exit.
4. Grounded plug protected with a magneto-
thermic circuit breaker.
5. Water supply tube (supplied with machine)
from water softener.
6. Drain tube
7. Water softener
This equipment shall be installed in accordance
with local plumbing codes
Models
with vibrating pump
include
as an
accessory a pressure reducer and a pressure
gauge to adjust the network pressure to 1 bar.
i
20
Summary of Contents for Ruby
Page 1: ...Ver 02 06 2021 ...
Page 2: ......
Page 7: ...2500 W 230 V 1500 W 115 V ...
Page 19: ...2500 W 230 V 1500 W 115 V ...
Page 26: ...ATTENZIONE MACCHINA PER USO ESCLUSIVAMENTE PROFESSIONALE MANUALE DI ISTRUZIONI IT ...
Page 31: ...2500 W 230 V 1500 W 115 V ...
Page 38: ...ACHTUNG NUR FÜR PROFESSIONELLE ANWENDUNG GEEIGNET BEDIENUNGSANLEITUNG DE ...
Page 43: ...2500 W 230 V 1500 W 115 V ...
Page 50: ...ATENÇÃO MÁQUINA PARA USO EXCLUSIVAMENTE PROFISSIONAL MANUAL DE INSTRUÇÕES PT ...
Page 55: ...2500 W 230 V 1500 W 115 V ...
Page 62: ...ATTENTION MACHINE À USAGE PROFESSIONNEL UNIQUEMENT MODE D EMPLOI FR ...
Page 67: ...2500 W 230 V 1500 W 115 V ...
Page 74: ......
Page 75: ......
Page 76: ......