ENgLIsh
26
6 - START UP
1
Steam tap
2
Atomizer pipe
3
Water supply tap
4
Hot water supply
5
Tank cover
6
Boiler manometer
7
Pilot light for machine on
8
Tank
9
Main switch
10
Button- 1 strong coffee (GD)
11
Button -2 strong coffees (GD)
12
Button- 1 weak coffee (GD)
13
Button -2 weak coffees (GD)
14
Delivery / Stop Button (GD)
15
Coffee control switch (GE)
16
Power supply cable
17
Level pilot light for lack of water in tank
(GE version only)
18
Coffee switch pilot light (GE)
After completing the machine preparation, proceed to the start up.
Position the machine main switch (
9
) to position
the ma-
chine on indicator will come on (
7
).
- The auto-levelling device will come into operation.
Only during the first loading, this operation can take quite a long
time and make the machine stop; in this case switch off the machine
and switch it on again by acting on the main switch (Fig.6.01-
pos.
9
).
- Then wait until the machine reaches the operating pressure of “1,2
- 1,3 BAR” by checking the boiler pressure on the manometer
(Fig.6.01-pos.
6
).
- The machine is now ready for use.
A
B
Fig.6.02
Warning !!
When the machine is new the filter-holder sump may not be
aligned (perpendicular to the machine itself) as shown in the
figure at the side, however this does not effect the efficient
function of the same.
After a short period of use the sump will gradually settle into
a correct position.
A
= Position of closed filter-holder with new machine.
B
= Position of closed filter holder with machine after a short period
of use.
16
mod. GD
mod. GE
10 11 12
13 14
15
18
5
8
9
3
1
4
7
2
6
9
17
Fig.6.01
Note:
Options include shower head gaskets that are thinner (8.1 mm,
part no. NG01/005) or thicker (9.0 mm, part no. NG01/002) than the
standard shower head gasket (8.5 mm, part no. NG01/001/B).
Summary of Contents for GE-GD
Page 2: ......
Page 4: ......
Page 6: ...I GB D F E...
Page 74: ...SAE0459_01...
Page 75: ...SAE0459...
Page 76: ...SAE0460_01...
Page 77: ...SAE0460...
Page 78: ......