ENGLISH
• 9 •
Description of parts:
FIG. 01
1
Main
switch
2
Coffee dispensing button
3
Coffee dispensing button
4
Overflowing protection hole
5
Steam
button
6
Dose programming/Manual dispensing
button
7
Correct temperature light
8
Turbo frother steam nozzle (removeable)
9
Filterholder
10
1 cup filter
11
2 cup filter
12
Basin
(removable)
13
“Perfect crema” filter (OPTION)
14
Brewing
head
15
Filterholder
gasket
16
Shower disc holder
17
Shower
disc
18
Tamper
19
Power cable and plug
20
Measuring
spoon
21
Delivery spout
22
Tank
cover
23
Grid
(removable)
24
Cappuccino maker kit (OPTION)
25
Steam/hot water knob
26
Removable water tank
27
Anti-fingerprint cleaner for stainless steel
28
Level indicator for the basin
29
Coffee pod filter
Instructions for the power supply cord
A
A short power-supply cord is provided to
reduce risks of getting tangled up or tripping
over a longer cord.
B
Longer extension cords are available and
may be used if care is exercised in their use.
C
If a long extension cord is used:
1 the marked electrical rating of the extension
cord should be at least as great as the electri-
cal rating of the appliance.
2 if the appliance is of the grounded type, the
extension cord should be a grounding-type
3-wire cord, and
3 the longer cord should be arranged so that it
Preparation:
1. Remove the water tank cover (22) and fill
with cold water to the MAX line indicated
on tank (26). See FIG. 2.
N.B.
:
Near the word MAX on the tank there
is the overflowing safety hole (4) in case of
tank overfilling.
The water tank can also be removed, after
removing the tank cover (22) using the
handle.
Re-install tank with water and cover (22).
2. Insert plug (19) into a suitable wall outlet (see
point 1 under “Caution”).
3. Push the main switch (1). The temperature
light (7) will flash until the temperature is
reached; when the temperature is reached
the light will remain on.
The lights of buttons 2 - 3 - 6 will remain on
in a fixed way.
Starting up
This procedure fills the water boiler with fresh
water.
This should be done whenever the machine is
switched on.
This machine, featuring a pump to brew coffee,
is equipped with a self-priming system.
Put an empty cup below the steam frother (8),
turn the steam knob (25) clockwise.
You will hear the noise of the enabled pump
and after a few seconds water will come down
from steam rod (8).
When the cup is filled close the steam knob
(25).
The
Gaggia
machine is now ready to be
used.
will not drape over the counter top portable
top where it can be pulled on by children or
tripped over.