background image

Elnur

 

powered by Gabarrón  |  ECOMBI SSH  |  Installation Guide

3

2. INSTALLATION INSTRUCTIONS

The symbols used in the text are explained below:

 

WARNING   This indication shows the possibility of causing death from electric shock.

 

 

 

WARNING   This indication shows the possibility of causing death or serious injury.

 

 

 

CAUTION   This indication shows the possibility of causing injury or damage to  

 

 

properties only.

  

  

  

Symbol for useful information.

 IMPORTANT:

 Wiring procedures and connections shall 

be in accordance with the national and local codes 

having jurisdiction.
•    The installation must be carried out in accordance  

with the current local electrical regulations.  

Any installation or reinstallation has to be carried  

out by an experienced technician.

•   Neither the connecting cable nor any other object  

  must come into contact with the hot unit.
•   Please check that the voltage in the rating label fits  

  the power supply. The nominal charging period of this  

  heater is indicated in the rating label. This appliance  

  must be grounded.
•   The appliance should not be installed just below an  

  electrical socket.
•    The appliance must be installed in such a way that  

it is impossible for anyone using a bath or shower,  

to touch the controls.

•  If during any installation the thermal insulation shows  

  any sign of damage, it must be replaced.
•   This heater should be switched off at the circuit  

  breaker before any repair work is carried out.  

  This should also be done during times of the year  

  when heat is not required.
•    This appliance is only for permanent connection to  

a fix installation. The supply circuit to the heater must  

incorporate a double pole isolating switch having a  

contact separation of at least 3 mm.

•   After installation a survey of the first charging cycle  

  should be carried out to ensure that the main input 

  thermostat switches off. Ventilate the room during  

  this first cycle.
•   To maintain stability, it is essential that the heater is  

  placed on a level surface and care should be taken  

  to avoid irregular surfaces, such as may result from  

  carpets or tiled surrounds partially protruding under  

  the heater.
•    The presence of air particles of smoke, dust and  

other pollutants could, in time, discolour the walls 

and surfaces around the heater.

•   Incorrect time settings, erroneous programming of the  

  reduced rate time and too high temperature settings  

  may result in a high cost of your electricity bill.

In order to achieve a correct installation of this device, 

follow these steps:
1.    Choose the right location to install ECOMBI SSH.  

The minimum clearances must be respected from  

the appliance to any combustible material such as  

furniture or curtains.  

To reduce the risk of fire,  

do not store or use gasoline or other flammable  

vapours and liquids in the vicinity of the heater.

2.  Open the carton at the indicated side and install the  

  supporting feet without removing the heater.

!

!

!

Summary of Contents for Elnur ECOMBI SSH Series

Page 1: ...se read these instructions carefully before installing or using this appliance for the first time Installation Instructions ECOMBI SSH Digital Smart Storage Heaters ECOSSH158 ECOSSH208 ECOSSH308 ECOSS...

Page 2: ...inuously supervised Do not operate any heater after it malfunctions Disconnect power at service panel and have heater inspected by a reputable electrician before reusing To disconnect heater turn cont...

Page 3: ...be switched off at the circuit breaker before any repair work is carried out This should also be done during times of the year when heat is not required This appliance is only for permanent connection...

Page 4: ...sing the appropriate screws 4 Place ECOMBI SSH in your selected installation area Use the heater fixing holes as a template and mark the wall through the fixing holes with a pencil Drill the required...

Page 5: ...t by removing the FAST ON terminal on each end of the element WARNING Steel edges can cut Next unscrew the inner panel and remove it CAUTION In the interior part of this inner panel there is a very de...

Page 6: ...eing careful not to damage the insulation on the bottom of the heater 9 Place the storage bricks carefully with the flat side facing the back of the heater Arrange two row levels of bricks 10 Place th...

Page 7: ...crews RELOCATION If during reinstallation the thermal insulation shows any sign of damage it must be removed and replaced by an identical part WARNING Relocation to another location must be carried ou...

Page 8: ...Programming Temperature level for each time interval 1h of the day Button Press the key to increase different values or scroll through menus Button Press the key to decrease different values or scrol...

Page 9: ...P01 is displayed Charging period used by Ecombi SSH goes from UP02 parameter Charging period start By default 00 00 to UP03 parameter Charging period end By default 07 00 Use and buttons to move forwa...

Page 10: ...ge Func is displayed to access operation mode menu 3 Press or buttons to select manual 24hours Set point Temperature operation mode Press button to confirm Current charge level and set point temperatu...

Page 11: ...7 00 UP04 Starting time off peak period 2 00 00 UP05 Ending time off peak period 2 00 00 UP06 Charging days of the week Default Charging 7 days of the week UP07 Ambient sensor Offset 0 C UP08 Max Bala...

Page 12: ...st be activated Press the associate button at the back of the hub for 3 seconds An orange flashing light every second indicates association mode 4 2 With the hub in association mode press on the stora...

Page 13: ...espond If the symbol is displayed the keyboard is locked Hold and buttons simultaneously for 3 seconds to unlock the keyboard See Keyboard Lock Section ECOMBI SSH does not communicate with the G Contr...

Page 14: ...y assured quality system and using environmentally friendly processes Once its useful life is finished please take the device to a recycling depot so that its components can be recycled in an appropri...

Page 15: ...Elnur powered by Gabarr n ECOMBI SSH Installation Guide 15 LE BALANCING ELEMENT LIMITER LR CUT OUT MANUALLY LIMITER LE BALANCING ELEMENT LIMITER LR CUT OUT MANUALLY LIMITER...

Page 16: ...7W Storage Heater Output 975 1062W 1300 1415W 1950 2123W 2600 2831W Charge Period 7 6 7h 7 6 7h 7 6 7h 7 6 7h Charging 7 4 kWh 9 9 kWh 14 9 kWh 19 8 kWh Insulation Class I Class I Class I Class I Leng...

Page 17: ...andby mode el sb 0 0005 0 0005 0 0005 0 0005 kW MODEL S GABARRON ECOSSH158 ECOSSH208 ECOSSH308 ECOSSH408 ErP Item Value All models Type of heat input Electronic heat charge control with room and or ou...

Page 18: ...ay not be treated as household waste Instead it shall be handed over to the applicable collection point for the recycling of electrical and electronic equipment By ensuring this product is disposed of...

Reviews: