background image

Elnur

 

powered by Gabarrón  |  ECOMBI SSH  |  Installation Guide

8

3. OPERATING INSTRUCTIONS

On/Off

Once the heater is connected to a mains supply you can turn the heater ON by  

switching the main ON/OFF switch positioned on the rear of the right hand side  

of the heater as shown above. 

Backlight

Press any button and the display will illuminate with a soft white colour.  

The display back light will turn off after time if no buttons are pressed. 
Programming Buttons will only respond when the back light is on. 

Keyboard Lock

During any operation mode, it is possible to lock the keyboard. 
You can do this by holding both the       and       buttons simultaneously 

until the padlock indicator   is displayed on the screen.

G-Control Hub 

connection indicator

Daily Programming: 

Temperature level for 

each time interval (1h) 

of the day

Button “+” Press 

the key to increase 

different values or 

scroll through menus

Button “-” Press the 

key to decrease 

different values or 

scroll through menus

“Config/Prog” Button  

Press the button to access 

the advanced configuration 

and exit menu items

Open Windows 

detection indicator

Keyboard lock indicator

Programme mode 

indicator

“OK” Button
Press the button to check and set the time. Press 

the button to confirm values in the different menus

Current charge level 

Current set point in 

Programme Mode 

To unlock the keyboard, press the       and        simultaneously until the 

padlock indicator   disappears from the screen.

3.1 General information

Connection/Disconnection

Power switch. All models are equipped with a switch on the  

back side panel. It is used to Turn On and Turn Off the ECOMBI SSH. 

Keyboard:

CAUTION: 

DO NOT USE THIS HEATER TO DRY CLOTHES.  

Do not cover this heater at any time. 

!

Summary of Contents for Elnur ECOMBI SSH Series

Page 1: ...se read these instructions carefully before installing or using this appliance for the first time Installation Instructions ECOMBI SSH Digital Smart Storage Heaters ECOSSH158 ECOSSH208 ECOSSH308 ECOSS...

Page 2: ...inuously supervised Do not operate any heater after it malfunctions Disconnect power at service panel and have heater inspected by a reputable electrician before reusing To disconnect heater turn cont...

Page 3: ...be switched off at the circuit breaker before any repair work is carried out This should also be done during times of the year when heat is not required This appliance is only for permanent connection...

Page 4: ...sing the appropriate screws 4 Place ECOMBI SSH in your selected installation area Use the heater fixing holes as a template and mark the wall through the fixing holes with a pencil Drill the required...

Page 5: ...t by removing the FAST ON terminal on each end of the element WARNING Steel edges can cut Next unscrew the inner panel and remove it CAUTION In the interior part of this inner panel there is a very de...

Page 6: ...eing careful not to damage the insulation on the bottom of the heater 9 Place the storage bricks carefully with the flat side facing the back of the heater Arrange two row levels of bricks 10 Place th...

Page 7: ...crews RELOCATION If during reinstallation the thermal insulation shows any sign of damage it must be removed and replaced by an identical part WARNING Relocation to another location must be carried ou...

Page 8: ...Programming Temperature level for each time interval 1h of the day Button Press the key to increase different values or scroll through menus Button Press the key to decrease different values or scrol...

Page 9: ...P01 is displayed Charging period used by Ecombi SSH goes from UP02 parameter Charging period start By default 00 00 to UP03 parameter Charging period end By default 07 00 Use and buttons to move forwa...

Page 10: ...ge Func is displayed to access operation mode menu 3 Press or buttons to select manual 24hours Set point Temperature operation mode Press button to confirm Current charge level and set point temperatu...

Page 11: ...7 00 UP04 Starting time off peak period 2 00 00 UP05 Ending time off peak period 2 00 00 UP06 Charging days of the week Default Charging 7 days of the week UP07 Ambient sensor Offset 0 C UP08 Max Bala...

Page 12: ...st be activated Press the associate button at the back of the hub for 3 seconds An orange flashing light every second indicates association mode 4 2 With the hub in association mode press on the stora...

Page 13: ...espond If the symbol is displayed the keyboard is locked Hold and buttons simultaneously for 3 seconds to unlock the keyboard See Keyboard Lock Section ECOMBI SSH does not communicate with the G Contr...

Page 14: ...y assured quality system and using environmentally friendly processes Once its useful life is finished please take the device to a recycling depot so that its components can be recycled in an appropri...

Page 15: ...Elnur powered by Gabarr n ECOMBI SSH Installation Guide 15 LE BALANCING ELEMENT LIMITER LR CUT OUT MANUALLY LIMITER LE BALANCING ELEMENT LIMITER LR CUT OUT MANUALLY LIMITER...

Page 16: ...7W Storage Heater Output 975 1062W 1300 1415W 1950 2123W 2600 2831W Charge Period 7 6 7h 7 6 7h 7 6 7h 7 6 7h Charging 7 4 kWh 9 9 kWh 14 9 kWh 19 8 kWh Insulation Class I Class I Class I Class I Leng...

Page 17: ...andby mode el sb 0 0005 0 0005 0 0005 0 0005 kW MODEL S GABARRON ECOSSH158 ECOSSH208 ECOSSH308 ECOSSH408 ErP Item Value All models Type of heat input Electronic heat charge control with room and or ou...

Page 18: ...ay not be treated as household waste Instead it shall be handed over to the applicable collection point for the recycling of electrical and electronic equipment By ensuring this product is disposed of...

Reviews: