3. Installation
Page 3
1. Cassette
2. Pull rod
3. Lifter
4. Power switch
5. Lifter switch
6. Column
8. Base
9. Caster
Attention!
Check that plugs
are connected.
1
2
3
4
5
6
7
8
The shortwave infrared curing lamp is divided into 3 parts (a base, a column and a cassette).
1) Installation of the base.
a. Open the packing of the base.
b. Install the four wheels on the base respectively and tighten up the screws. Usually, the
wheels with brakes should be mounted on the rear of the base.
2) Installation of the column.
a. Open the packing of the column.
b. Put the column vertically on the top of the base, directly engage the screw holes and
tighten up using the screws.
c. Connect the support arm with the column for supporting cassette.
d. Connect the lifter with the column to control the up and down movement of cassette.
3) Installation of the cassette.
a. Open the packing of the cassette with care.
b. Connect cassette with support arm and tighten up with the screws.
c. Connect control wires and adjust the angle of cassette.