45
BOILER K
Original Instructions—rev.2011—in compliance with the paragraph 1.7.4 of the
Machinery Directive 2006/42/CE
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 –
25065
Cazzago San Martino (Bs) –
Italia –
Tel. + 39 030 7451154 –
Fax. + 39 030 73 56 629
After having supplied the pneumatic locking device with air, keep the locking jaws pressed with your hand and
move the lever upward to get the expansion shaft withdrawn in the machine.
If the assembling has been correctly executed the locking jaws should a little play in their seat.
Select the
LOCKING JAWS
according to the diameter of the pipe and install them on the expansion shaft as
shown in the picture.