44
BOILER K
Original Instructions—rev.2011—in compliance with the paragraph 1.7.4 of the
Machinery Directive 2006/42/CE
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 –
25065
Cazzago San Martino (Bs) –
Italia –
Tel. + 39 030 7451154 –
Fax. + 39 030 73 56 629
Slide the vane expansion shaft into the guiding shaft , and screw it counter clockwise until you will obtain a
gap of 0.5 ÷ 1 mm by screwing back on the vane abutment cap.