Original-Bedienungsanleitung FUXTEC FX-AF1196_de_en_fr_ita_rev02
60
7.6.4 Adjusting the belt tension
1
Bracket
2
Forward cable
3
Reverse cable
4
Upper lock nut
5
Lower lock nut
Proper belt tension is critical for good work performance. After half an hour
of operation, all belts may need adjustment due to initial stretch. After that,
you should check the tension after every 2 hours of operation.
To increase the belt tension:
•
Loosen the upper jam nut and unscrew the nut.
•
Tighten the lower lock nut.
•
Check the adjustment.
This process can be repeated until the tube
adjustment screws are fully adjusted. If no further adjustments can be
made, the belt must be replaced.
Summary of Contents for FX-AF1196
Page 1: ...Original Bedienungsanleitung FUXTEC FX AF1196_de_en_fr_ita_rev02 1...
Page 13: ...Original Bedienungsanleitung FUXTEC FX AF1196_de_en_fr_ita_rev02 13...
Page 14: ...Original Bedienungsanleitung FUXTEC FX AF1196_de_en_fr_ita_rev02 14...
Page 113: ...Original Bedienungsanleitung FUXTEC FX AF1196_de_en_fr_ita_rev02 113 Avvertenze Tabella 1...
Page 137: ...Original Bedienungsanleitung FUXTEC FX AF1196_de_en_fr_ita_rev02 137...