2-15
3. Lead in cable thru the appropriate location on the cable clamp and fix cable with
appropriate CKS clamp. Connect each cable to circuit board as shown in the figure on
the previous page.
Signal cable (10S2240) connects to “JUNCTION BOX” display side.
4. Lay the shield of each cable in the cable clamp.
5. Fasten the cable clamps.
Summary of Contents for FSV-30
Page 56: ...3 16 This page intentionally left blank ...
Page 60: ...4 4 This page intentionally left blank ...
Page 68: ...D 1 ...
Page 69: ...D 2 ...
Page 70: ...D 3 ...
Page 71: ...Y Hatai D 4 ...
Page 72: ...Y Hatai D 5 ...
Page 73: ...Takahashi T Y Hatai D 6 ...
Page 74: ...Takahashi T Y Hatai D 7 ...
Page 75: ...Y Hatai D 8 ...
Page 76: ...D 9 ...
Page 77: ...D 10 ...