2-7
3. Open the left side cover on the scanner unit with the hex wrench (supplied).
4. Unfasten the cable gland for the multicore cable and remove the gasket and
flat washers.
5. As shown in Figure 2-9, slide the clamping gland, flat washers and gasket on
the multicore cable.
6. Fold back armor by 5 mm and pass it through the two flat washers as shown in
Figure 2-9.
Armor (folded back)
Gasket
Seal with putty
after tightening.
Vinyl sheath
Clamping gland
Flat
washer
Cable gland
Flat
washer
Flat
washer
Figure 2-9 Passing clamping gland, washers and gasket on the multicore cable
7. Shorten conductors considering their locations on the terminal board STB-1.
RTB-801
STB-1
Figure 2-10 Scanner unit, port side view
8. Confirm that armor is grounded between two flat washers.
Summary of Contents for FR-2135S
Page 1: ......
Page 24: ...This page is intentionally left blank ...
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......