1-16
1.5 Power Supply Unit
Mounting considerations
The power supply unit may be mounted on a bulkhead or a deck. Because it has no operation
requirements it can be located almost anywhere, provided the location is well ventilated.
Mounting procedure
Fix the unit to the mounting location with four 6×20 self-tapping screws (local supply). For
mounting on a bulkhead, do the following:
1. Mark location for mounting holes.
2. Screw in the self-tapping screws at the location for the bottom fixing holes, leaving a gap of
about 5 mm between the bottom of the screw head and bulkhead.
3. Set the unit to the screws inserted at step 1.
4. Fasten the self-tapping screws at the top of the unit.
5. Tighten all self-tapping screws.
Mounting dimensions for power supply unit
240
±
1
420
±
1
2-
φ
7
FIXING
HOLE
TERMINAL
GND
TERMINAL
#: MAINTENANCE SPACE
WINDOW
LED
440
#50
(11)
R3.5
7
240
±
1
TERMINAL
9
Summary of Contents for FAR-2157
Page 8: ...vi This page is intentionally left blank...
Page 56: ...3 14 This page intentionally left blank...
Page 91: ...D 1...
Page 92: ...D 2...
Page 93: ...May 17 07 R Esumi D 3...
Page 94: ...1 Sep 2010 Y NISHIYAMA D 4...
Page 95: ...Takahashi T Y Hatai D 5...
Page 96: ...Jan 18 08 R Esumi D 6...
Page 97: ...Apr 23 07 R Esumi D 7...
Page 98: ...Apr 23 07 R Esumi D 8...
Page 99: ...Apr 23 07 R Esumi D 9...
Page 100: ...Apr 23 07 R Esumi D 10...
Page 101: ...Apr 23 07 R Esumi D 11...
Page 102: ...D 12...
Page 103: ...D 13...
Page 104: ...D 14...
Page 105: ...Y Hatai D 15...
Page 106: ...Y Hatai D 16...
Page 107: ...Y Hatai D 17...
Page 108: ...Y Hatai D 18...
Page 109: ...Apr 05 04 D 19...
Page 110: ......