1. MOUNTING
1-15
Changing the cable entrance location
1. Unfasten six screws (M4
u
8) at the bottom of the control unit.
2. Unfasten two screws (M4
u
10) fixing the cable clamp.
Discard these screws.
3. Unplug connectors from J1 and J2 on the KEY Board 10P6951.
Control unit
4. Attach the cable clamp removed at step 2 with two screws, spring washers, flat
washers and nuts (supplied with accessories) to fix the control cable shown be-
low.
Control head
5. Reattach connectors J1 and J2.
6. Fasten six screws to assemble the control unit.
*
*
*
*
*
J3
J1
J2
Default hole location
Screws
M4×8 (8 pcs.)
Remove this cable clamp.
Remove these two connectors.
*
*
*
*
*
Default hole location
Screws
M4×8 (8 pcs.)
Fix the cable with cable clamp here.
Cable clamp
Bottom chassis
Nut
Spring washer
Flat washer
Screw (M4×12)
Summary of Contents for CSH-8LMARK-2
Page 8: ...EQUIPMENT LISTS vi This page is intentionally left blank ...
Page 44: ...2 WIRING 2 18 This page is intentionally left blank ...
Page 58: ... 3 ...
Page 61: ...A 1 A 2 ...
Page 62: ...A 3 A 4 ...
Page 63: ...A 5 A 6 ...
Page 64: ......
Page 65: ...8 May 2013 H MAKI D 2 ...
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ...D 9 ...
Page 73: ...D 10 ...
Page 74: ...D 11 ...
Page 75: ...D 12 ...
Page 76: ...D 13 17 Jun 2015 H MAKI 17 Jun 2015 H MAKI 17 Jun 2015 H MAKI 17 Jun 2015 H MAKI ...
Page 77: ...D 14 ...
Page 78: ...D 15 ...
Page 79: ...D 16 ...
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ...D 20 D 20 D 20 D 20 ...
Page 84: ......