ii
TABLE OF CONTENTS
1. SYSTEM CONFIGURATION ........................................................... 1
2. EQUIPMENT LISTS ........................................................................ 2
3. MOUNTING THE EQUIPMENT
3.1 Mounting the Hull Unit ................................................................................................. 4
3.2 Mounting the Display Unit ............................................................................................ 9
3.3 Mounting the Transmitter Unit .................................................................................... 10
3.4 Mounting the Interface Unit ........................................................................................ 10
3.5 Grounding the Equipment ........................................................................................... 11
4. WIRING
4.1 How to Use the Crimping Tool, Pin Extractor ............................................................ 12
4.2 Location of Connectors, Terminal Boards .................................................................. 13
4.3 Assembling Connectors at Transmitter Unit ............................................................... 14
4.4 Connection of Transducer Cable ................................................................................. 16
4.5 Attaching Power Cable Connector NCS-253P ............................................................ 17
4.6 Synchronizing Transmission with Other Sonars, Echo Sounders ............................... 17
5. CONNECTION OF INTERFACE UNIT CS-120A
5.1 Connections for True Motion and Target Lock ........................................................... 18
5.2 Connections for ES Picture and FNZ Markers ............................................................ 19
5.3 Connections for Digital Readout of Position, Water Temperature and Depth ............ 20
5.4 Wiring .......................................................................................................................... 21
6. CHANGING POWER SPECIFICATIONS .......................................24
7. INSTALLATION OF FRP RETRACTION TANK
7.1 Before Beginning the Installation ............................................................................... 25
7.2 Installation of the FRP Retraction Tank ...................................................................... 26
8. ADJUSTMENT AND CHECK
8.1 Hull Unit Check .......................................................................................................... 28
8.2 Heading Adjustment .................................................................................................... 29
8.3 DIP Switch Setting ...................................................................................................... 30
8.4 Setting and Adjustment on the Interface Unit CS-120A ............................................. 31
9. WHEN SHIP’S MAINS IS 24 VAC ..................................................34
ACCESSORIES/SPARE PARTS/INSTALLATION MATERIALS
......... A-1
OUTLINE DRAWINGS
.............................................................................................. D-1
SCHEMATIC DIAGRAMS
....................................................................................... S-1
Summary of Contents for CSH-53
Page 1: ...COLOR SCANNING SONAR MODEL CSH 53 ...
Page 9: ...5 Heater Heat insulator BOW Figure 3 2 Maintenance space example sonar compartment ...
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......