25
7. INSTALLATION OF FRP RETRACTION
TANK
7.1 Before Beginning the Installation
Note the following before installing the FRP tank:
• Use only the tank supplied.
• Follow the instructions in this chapter.
• If the owner of the equipment elects to use a shipyard-prepared FRP tank, FURUNO will
assume no responsibility for any damage caused by water leakage. In this case do the fol-
lowing:
• The finished surface of the tank flange must be within 0.5 mm of horizontal.
• Use sealant recommended by shipyard.
Table 7-1 Contents of FRP retraction tank installation kit
e
m
a
N
e
p
y
T
.
o
N
e
d
o
C
y
t
Q
k
n
a
T
n
o
i
t
c
a
r
t
e
R
P
R
F
1
-
1
0
0
0
-
H
H
S
1
1
0
-
0
0
8
-
0
6
6
1
t
e
k
s
a
G
g
n
i
f
o
o
r
p
r
e
t
a
W
1
-
3
0
0
0
-
H
H
S
1
3
0
-
0
0
8
-
0
6
6
1
t
n
a
l
a
e
S
d
n
o
B
e
e
r
h
T
g
0
0
2
1
0
1
1
1
0
1
-
4
5
8
-
0
0
0
1
Summary of Contents for CSH-53
Page 1: ...COLOR SCANNING SONAR MODEL CSH 53 ...
Page 9: ...5 Heater Heat insulator BOW Figure 3 2 Maintenance space example sonar compartment ...
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......