8
Installing stays (anti-vibration measure)
Install stays from the top of the hull unit to the ship’s hull. The stays should be angle iron with
a size of 75 x 75 x 9 mm or more and at least two pieces should be used; one each to ship’s bow
and stern directions. Install if possible, two more stays in ship’s transverse direction.
Do not install the stays as shown below. Vibration-resistance effect is reduced since vibration is
applied to the stays as rotation force. Install them horizontally.
Figure 3-8 Wrong installation of stay
Fastening receiver unit to hull unit
Fasten the receiver unit to the left side of the hull unit as shown at right.
A transducer cable protection cover has been fitted where the receiver unit is to be fastened to
the hull unit. Remove it when mounting the receiver unit.
Summary of Contents for CSH-53
Page 1: ...COLOR SCANNING SONAR MODEL CSH 53 ...
Page 9: ...5 Heater Heat insulator BOW Figure 3 2 Maintenance space example sonar compartment ...
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......