background image

 

 

 

1/25/2016 

 

 Page | 6 

DGOI-C 64 ASSEMBLY INSTRUCTIONS 

C16AK0001, Issue 1 

 

 

 

 

  Remove the base cover by depressing the locking tab (Fig.4, vertical red arrow) 

  Push the plastic insert and remove the adapter plate (Fig.4); 

  Unscrew the connecting rod from the base and the cover (Fig. 5); 

 

Fig.5 

NOTE: Select a drill with suitable diameter for anchor wall installation. 

Summary of Contents for OFS DGOI-C 64

Page 1: ...1 25 2016 Page 1 DGOI C 64 ASSEMBLY INSTRUCTIONS C16AK0001 Issue 1...

Page 2: ...Page 2 DGOI C 64 ASSEMBLY INSTRUCTIONS C16AK0001 Issue 1 Contents 1 General Information 3 2 Composition 4 3 Installation Instruction and Assembly 5 4 Care and Security 23 5 Discard 23 6 Technical Assi...

Page 3: ...nts for drops and building Riser cable 1 2 Application Designed for indoor use at the building entrance the enclosure provides security and quick activation of drops on the front adapter panel The rea...

Page 4: ...e basic module Description Quantity 1 Cover 1 2 Base 1 3 Connection Cover and Base 1 4 Adapter Tray 1 5 Splice Tray 1 6 Tray Cover 1 7 Splice Protector support 2 8 Splice Tray Holder 1 9 Fiber Holder...

Page 5: ...of the adapter panel and for attachment of an expansion piece to the base qty 8 Fig 11 Other supplies for installation include protection tube spiral tube Velcro cable ties ty wraps splice protectors...

Page 6: ...ve the base cover by depressing the locking tab Fig 4 vertical red arrow Push the plastic insert and remove the adapter plate Fig 4 Unscrew the connecting rod from the base and the cover Fig 5 Fig 5 N...

Page 7: ...rder to insert the provided nylon wall anchors Secure the base to the wall The distance between mounting holes is shown on Figure 6 Fig 6 3 3 Module installation Use pliers to open the base side where...

Page 8: ...all the two enclosures to the wall Use the following distances for drilling when installing two or more enclosures Fig 8 Fig 8 After attachment of the modules to the wall insert the plastic expansion...

Page 9: ...ansion bracket with two M3X6 mm screws Fig 11 Fig 11 3 4 Adapter Installation Install adapters Fill the adapter plate from left to right and top to bottom Fig 12 Fig 12 NOTE Install optical adapters i...

Page 10: ...it s to accommodate the fibers within the enclosure Insert the cable in the rubber cable entry port When preparing the cable leave 60 mm of strength member FRP Strength member for anchoring the cable...

Page 11: ...SEMBLY INSTRUCTIONS C16AK0001 Issue 1 3 6 Fiber unit routing to the splice tray Rotate the plastic holders and position the cable as indicated below in Fig 15 Fig 15 Route the fibers and prepare the e...

Page 12: ...C 64 ASSEMBLY INSTRUCTIONS C16AK0001 Issue 1 Remove the splice tray cover Fig 17 Fig 17 Place the fiber unit into the desired position for installation Place a mark where to prep the tube jacket of t...

Page 13: ...t or tube and clean the fibers Fig 19 Fig 19 Secure the fiber unit in the tray Cut approximately 10 mm of the foam supplied with the splice tray Place the fiber unit either tube or buffered fiber in t...

Page 14: ...ate the plastic cable tie installation Fig 21 Route the fibers in the tray and cut off the tie wrap excess Fig 22 Fig 22 Re install the lid on the splice tray 3 7 Splitter Installation Unscrew the par...

Page 15: ...in place to support the splitters Fig 24 Screw the splitters parking support and route the fiber to the tray Fig 25 Fig 25 Remove the cord cover to the entrance of the splice tray with a suitable tool...

Page 16: ...0001 Issue 1 Attach the fibers with Velcro Route the fiber units following the path shown in Figure 27 Plug the connectors to the parking holder as shown Fig 27 Fiber units routing 3 8 Pigtail Install...

Page 17: ...1 Insert the connectors into the adapters on the rear of the panel Fig 29 Fig 29 Accommodate the fibers along the way and attach a transparent protection sheet into position with the screws provided F...

Page 18: ...0001 Issue 1 FIG 31 Position of the protection sheet screws NOTE Accommodate the fibers under the fiber routing fingers Fig 32 Fig 32 Take the fibers to the splice tray by 12 fiber groups and insert t...

Page 19: ...to protect the fibers and secure the fibers in the splice tray Fig 34 Fig 34 3 9 Output cables installation Alternative entries Note Utilize one of the holes indicated Fig 35 Fig 35 Insert the cable i...

Page 20: ...e yarn Trim the excess of the cable ties 3 10 Installing the cable gland If necessary decide which of the two entry locations the gland will be installed After the determination of inputs and outputs...

Page 21: ...and Tight the nuts to secure gland and the cable Fig 39 Fig 39 3 11 Adding Customer Fiber Patch In order to activate a client remove the connecter to be used from the parking bracket and plug it into...

Page 22: ...16 Page 22 DGOI C 64 ASSEMBLY INSTRUCTIONS C16AK0001 Issue 1 Insert the Velcro in position Fig 41 Fig 41 3 12 Lock and Security To close the box lift the lid and lock the plastic cover in place Fig 42...

Page 23: ...attention to the laser radiation warnings avoiding looking into active connections with a magnifying device when the laser is connected Use goggles appropriate for the type of laser in the link and w...

Page 24: ...1 25 2016 Page 24 DGOI C 64 ASSEMBLY INSTRUCTIONS C16AK0001 Issue 1 This page is left intentionally empty...

Reviews: