![Fujitsu WATERSTAGE 112 Maintenance Document Download Page 133](http://html.mh-extra.com/html/fujitsu/waterstage-112/waterstage-112_maintenance-document_118748133.webp)
Heat Pump, Split System, Single Service, 3 phase
Maintenance Document
1394-1
133
STARTING UP
Switching On
(See "Starting up" section of "Installation" instructions)
OK
NON COMPLIANT
Switching on
Initialisation for a few seconds
Operation of the pumps
Outdoor unit starts after 3mins
Checks on Outdoor Unit
OK
NON COMPLIANT
VALUE
Operation of fan(s), compressor
Current measurement
After a few minutes, measurement of air temp delta
Check condensation and evaporation pressure/temperature
Checks on Hydraulic Unit
OK
NON COMPLIANT
VALUE
after 15 minutes of operation
primary water temp delta
DHW priority (switching of selection valve)
operation of heating, mixing valve, boiler backup, etc.
Control settings
Room Control
(See "Room Sensor Configuration" section of "Installation" instructions)
OK
NON COMPLIANT
Settings, manipulations, checks
Setpoint display
Explanations on use
OBSERVATIONS
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
ALL PERSONS PRESENT AT STARTUP MUST SIGN
USER
INSTALLER
VENDOR
AFTER SALES
Summary of Contents for WATERSTAGE 112
Page 2: ......