50
Operating Manual
RX900
S2
Important information
4.5
Notes on installing the server in the rack
V
CAUTION!
●
For safety reasons, at least two people and a suitable lifter are
required to install the server in the rack because of its weight
and size.
(For the Japanese market, please refer to "
安全上の注意およびその
他の重要情報
".)
●
Never lift the server into the rack using the handles on the front panel.
●
When connecting and disconnecting cables, observe the relevant
instructions in the "Important Information" chapter of the technical
manual for the corresponding rack. The technical manual is supplied
with the corresponding rack.
●
When installing the rack, make sure that the anti-tilt mechanism is
correctly fitted.
●
For safety reasons, no more than one unit may be removed from the
rack at any one time during installation and maintenance work.
●
If several units are simultaneously removed from the rack, there is a
risk that the rack could tip over.
●
The rack must be connected to the power supply by an authorized
specialist (electrician).
●
If the server is integrated into an installation that draws power from an
industrial power supply network with an IEC309 type connector, the
power supply's fuse protection must comply with the requirements for
non-industrial power supply networks for the type A connector.
Summary of Contents for PRIMERGY RX900 S2
Page 1: ...Operating Manual English PRIMERGY RX900 S2 Server Operating Manual Edition June 2011 ...
Page 6: ...Operating Manual RX900 S2 ...
Page 10: ...Operating Manual RX900 S2 Content ...
Page 36: ...36 Operating Manual RX900 S2 Functional overview ...
Page 76: ...76 Operating Manual RX900 S2 Hardware installation ...
Page 96: ...96 Operating Manual RX900 S2 Property and data protection ...
Page 102: ...102 Operating Manual RX900 S2 Troubleshooting and tips ...
Page 110: ...110 Operating Manual RX900 S2 CSS components ...