RX600 S6
Operating Manual
43
Hardware installation
4.2
Rack installation/removal of server
V
CAUTION!
●
Please observe the safety information and notes on rack mounting in
chapter
"Important information" on page 27
.
●
At least two people are needed to install / remove the server in the
rack. (For the Japanese market, please refer to "
安全上のご注意
".)
●
The rack may tip over if more than one unit is removed at the same
time.
●
The server may not occupy the top height units of the rack
(38HU/42HU PRIMECENTER Rack, DataCenter Rack, 19-inch
standard rack (for the Japanese market)), as otherwise boards
cannot be replaced.
4.2.1
Rack system requirements
The rack systems from Fujitsu PRIMECENTER Rack, DataCenter Rack and
19-inch standard rack (for the Japanese market) support the installation of
PRIMERGY servers. Installation in most current rack systems from other
manufacturers (3rd party racks) is also supported.
To accommodate the ventilation concept and ensure proper ventilation, any
unused areas in the rack must be sealed using dummy covers.
The power is supplied via the multiple socket outlets fitted in the rack.
Fujitsu rack systems
The main features of PRIMECENTER Rack, DataCenter Rack and 19-inch
standard rack (for the Japanese market) are as follows:
– support systems that can be mounted without tools
– support systems having a linear alignment feature to ensure that they can
be adjusted to different rack depths
PRIMECENTER Rack and DataCenter Rack provide an enhanced cable
management in the lateral rack area.