RX2530 M4
Operating Manual
69
Starting up and operation
6.1.2.2
Indicator on PSU (slide-in unit)
Figure 17: PSU status indicator (AC PSU)
Figure 18: PSU status indicator (DC PSU)
Pos. Indicator
Status
Description
1
PSU status
indicator
green
flashing
The server is switched off, but AC voltage /
DC voltage is present (standby mode).
green on
The server is switched on and operating
properly.
orange
flashing
An overload has been detected. The PSU is
still running, but failure might be imminent.
orange on
An PSU failure has been detected. Possible
causes:
– Over/under voltage
– Overheating
– Fan failure
0
Summary of Contents for PRIMERGY RX2530 M4
Page 1: ...Operating Manual English FUJITSU Server PRIMERGY RX2530 M4 Operating Manual June 2018 ...
Page 8: ...Operating Manual RX2530 M4 Contents ...
Page 12: ...12 Operating Manual RX2530 M4 Introduction ...
Page 58: ...58 Operating Manual RX2530 M4 Hardware installation ...
Page 80: ...80 Operating Manual RX2530 M4 Starting up and operation ...
Page 82: ...82 Operating Manual RX2530 M4 Property and data protection ...