U41644-J-Z816-5-76
2-29
Laufende K/F 1
*1:
Power cables (Input#0 to Input#3) of the main unit (PRIMEQUEST 520A*/
520/420) are connected to PSUs (PSU#0 to PSU#3) as shown below on a
one-to-one basis.
*2:
For information about the circuit breakers on the customer's distribution
panel, see
Section 2.6, "Circuit Breaker Characteristics."
Figure 2.14 Input power system diagram of the PRIMEQUEST 520A*/520/
420 including the peripherals in a dual power feed configuration for use
outside Japan (general) (2/2)
*: not supported by Fujitsu Technology Solutions