4.2 Power Supply Requirements
Figure 4.7 shows the Max Seek current waveform of +5V DC and +12V DC.
+5VDC
MBA3300FD MBA3147FD MBA3073FD
C
u
rrent
(500mA
/di
v)
C
u
rrent
(500mA
/di
v)
C
u
rrent
(500mA
/di
v)
Time (10 msec/div)
Time (10 msec/div)
Time (10 msec/div)
+12VDC
MBA3300FD MBA3147FD MBA3073FD
C
u
rrent
(500mA
/di
v)
C
u
rrent
(500mA
/di
v)
C
u
rrent
(500mA
/di
v)
Time (10 msec/div)
Time (10 msec/div)
Time (10 msec/div)
Figure 4.7
Current waveform (Max seek)
(3)
Power on/off sequence
The order of the power on/off sequence of +5V DC and +12V DC, supplied to the HDDs, does not
matter.
(4)
Sequential starting of spindle motors
After power is turned on to the HDDs, a large amount of current flows in the +12V DC line when the
spindle motor rotation starts. Therefore, if more than one HDD is used, the spindle motors should be
started sequentially using one of the following procedures to prevent overload of the power supply
unit. Regarding how to set a spindle motor start control mode, see Subsection 5.2.2.
a) Control the sending of the START/STOP UNIT command so that the spindle motors of
individual HDD are started in intervals of 12 seconds or more.
b) Turn on the +12V DC power in the power supply unit at intervals of 12 seconds or more to start
the spindle motors sequentially.
C141-E264
49
Summary of Contents for MBA3073FD
Page 1: ...C141 E264 01EN MBA3300FD MBA3147FD MBA3073FD HARD DISK DRIVES PRODUCT MANUAL ...
Page 4: ...This page is intentionally left blank ...
Page 12: ...This page is intentionally left blank ...
Page 32: ...This page is intentionally left blank ...
Page 74: ...This page is intentionally left blank ...
Page 90: ...This page is intentionally left blank ...
Page 96: ...This page is intentionally left blank ...
Page 102: ...This page is intentionally left blank ...
Page 104: ...This page is intentionally left blank ...
Page 105: ......
Page 106: ......