background image

En-11

9. EXTERNAL INPUT

•  

RB unit can be switched cooling priority and heating priority by using RB unit 
PC board CNA01 or CNA02.

•  

The "external input priority mode" must be set by changing DIP switch SET2-
1,2 on PC board of RB unit.

•  

A twisted pair cable (22AWG) should be used. Maximum length of cable is 
492 ft (150 m).

•  

Use an external input cable with appropriate external dimension, depending 
on the number of cables to be installed.

•  The wire connection should be separate from the power cable line.

INPUT SELECT

Use either one of these types of terminal according to the application. (Both types of 
terminals cannot be used simultaneously.

Dry contact terminal ([CNA01])

When a power supply is unnecessary at the input device you want to connect, use 
the Dry contact terminal ([CNA01]).

*a:  Select very low current use 

contacts (usable at DC12V, 
DC1mA or less).

*b:  The wiring is different from 

Apply voltage terminals. Be suf-

fi

 ciently careful when wiring.

1
2

connected unit

PC Board

GND

*a

*b

CNA01

When connected to Dry contact terminals of multiple RB units with a connected unit, 
insulate each RB unit with relay, etc. as shown on below example.

RB

 u

n

it

RB

 u

n

it

P

ow

er s

up

pl

y f

or r

el

ay

Input device

K1-K2 : Relay 
(Device for DC current)

PC board

PC board

K1

K2

CNA 01

CNA 01

 NOTE : 

When connected to multiple RB units directly, it will cause breakdown.

Apply voltage terminal ([CNA02])

When a power supply must be provided at the input device you want to connect, use 
the Apply voltage terminal ([CNA02])

1
2
3

+

+

-

-

Input

 de

vic

e

Load 

resistance

*1

DC power sup-

ply 12 - 24V

connected unit

PC board

CNA02

*c

*d

*1:  Make the power supply DC12 to 24V. Select a power supply capacity with an

 ample surplus for the connected load.

 Do not impress a voltage exceeding 24V across pins 1-3.

*c:  The allowable current is DC 5mA to 10 mA. (Recommended: DC 5mA) 

 Provide a load resistance such that the current becomes DC 10mA or less.
 Select very low current use contacts (usable at DC 12V, DC 1mA or less).

*d:  The polarity is [+] for pin 1 and [-] for pin 3. Connect correctly.

When connected to Apply voltage terminals of multiple RB units with a connected 
unit, be sure to make a branch outside the RB unit using a pull box, etc. as shown on 
below example.

In

p

u

t d

ev

ic

RB

 u

n

it

RB

 u

n

it

Load 
resistance

DC power 
supply 12 - 24V

connected unit

PC board

PC board

CNA 
02

CNA 
02

COOLING/HEATING PRIORITY FUNCTION

"Edge" input only

Connector

Input signal

Command

CNA01 or CNA02

OFF 

 ON

Heating priority

ON 

 OFF

Cooling priority

CNA01 or CNA02

Priority mode 

Heating

On

Off

Cooling

10. TEST RUN

10.1. Test run using Outdoor unit (PC board)

•  Refer to the Installation Manual for the outdoor unit to perform the test run using the 

outdoor unit.

10.2. Test run using Remote Controller

•  Refer to the Installation Manual for the remote controller to perform the test run 

using the remote controller.

11. CHECK LIST

Pay special attention to the check items below when installing the RB unit (s). After 
installation is complete, be sure to check the following check items again.

CHECK ITEMS

If not performed correctly

CHECK 

BOX

Has the RB unit been installed 
correctly?

Vibration, noise, RB unit may 
drop

Has there been a check for gas 
leaks (refrigerant pipes)?

No cooling, No heating

Has heat insulation work been 
completed?

Water leakage

Is the voltage of the power source 
the same as that indicated on the 
label on the RB unit?

No operation, heat or burn 
damage

Is the address setting correctly 
configured?

No operation

Are the wires and pipes all 
connected completely?

No operation, heat or burn 
damage

Is the RB unit earthed (grounded)?

Short circuit

Is the connection cable the specified 
thickness?

No operation, heat or burn 
damage

9366249030-05_IM.indb   Sec1:11

9366249030-05_IM.indb   Sec1:11

2015/2/26   13:11:34

2015/2/26   13:11:34

Summary of Contents for Airstage UTP-RU01AH

Page 1: ...tage Parts for the Fujitsu LonWorks cables are the following Cable Type Pairs Details Catalog Number Level 4 NEMA 22AWG 1 250ft LonWorks Shielded cable K00250LW 1 500ft LonWorks Shielded cable K00500LW This addendum information shall supersede any LonWorks cable requirements listed in any of the Airstage Design Technical Manuals or Installation Manuals Design Technical Manual for Airstage V II 208...

Page 2: ...service personnel only TM Français Español MANUEL D INSTALLATION MANUAL DE INSTALACIÓN UNITÉ DE DÉRIVATION DE RÉFRIGÉRANT UNIDAD DE DERIVACIÓN DE REFRIGERANTE Pour le personnel agréé uniquement Únicamente para personal de servicio autorizado UTP RU01AH UTP RU01BH UTP RU01CH ...

Page 3: ... and floors In an Area with High Winds Securely anchor the outdoor unit down with bolts and a metal frame Provide a suitable air baffle In a Snowy Area for Heat Pump type Systems Install the outdoor unit on a raised platform that is higher than drifting snow When Connecting Refrigerant Tubing Keep all tubing runs as short as possible Use the flare method for connecting tubing Apply refrigerant lub...

Page 4: ...t breaker operating on all wires with a distance between contact of 1 8 in 3 mm for this unit The unit must be correctly grounded and the supply line must be equipped with a dif ferential breaker in order to protect the persons The units are not explosion proof and therefore should not be installed in explosive atmosphere Do not turn on the power until all installation work is complete This unit c...

Page 5: ...nstallation manual 5 INSTALLATION WORK 5 1 Selecting an installation location WARNING Take into consideration whether the place you install the main unit can fully with stand its weight For hanger bolts use embedded inserts or embedded foundation bolts in the case of new installation and use a hole in anchor if already installed and attach in a way so that the unit s weight can be supported CAUTIO...

Page 6: ...unit side Product mass lbs kg UTP RU01AH 15 7 UTP RU01BH 17 7 5 UTP RU01CH 18 8 A A B B C C 20 500 or more 20 500 or more 1 20 or more 1 20 or more Ceiling hanging Installation limit Unit in mm 5 2 2 Wall hanging 13 1 8 333 11 16 18 9 16 15 7 13 16 198 10 9 16 268 198 7 13 16 7 1 4 Unit in mm service space grille 1 20 or more Installation limit 1 20 or more 12 300 or more E g If installing a duct ...

Page 7: ...s 1 1 1 2 4 4 5 5 5 5 3 Cover B Cover A Control box Control box cover Cable clamp 6 8 9 10 11 11 8 8 10 10 10 8 7 Cable clamp Accessory Cover B Cover A Control box Control box cover 6 Change the control box attachment position 7 Attach the cable clamp accessory Thereafter put the cable in the cable clamp 8 Fix the control box position 4 screws 9 Attach Cover B to Cover A 1 screw 10 Attach Cover A ...

Page 8: ...ndoor unit capacity Btu h Suction gas pipe in mm Discharge gas pipe in mm Gas pipe in mm 7 500 9 500 12 000 14 000 1 2 12 7 Reducer 3 8 9 52 Reducer 1 2 12 7 Reducer 18 000 24 000 30 000 5 8 15 88 Reducer 1 2 12 7 5 8 15 88 Reducer 36 000 48 000 3 4 19 05 1 2 12 7 3 4 19 05 60 000 3 4 19 05 5 8 15 88 Reducer 3 4 19 05 Table 3 Connection pipe selection for when 2 to 8 indoor units are connected Tot...

Page 9: ...ns for electrical wiring WARNING Electrical work must be performed in accordance with this Manual by a person certified under the national or regional regulations Be sure to use a dedicated circuit for the unit An insufficient power supply circuit or improperly performed electrical work can cause serious accidents such as electric shock or fire Before starting work check that power is not being su...

Page 10: ...river to tighten the terminal screws Do not use a screwdriver that is too small otherwise the screw heads may be damaged and prevent the screws from being properly tightened 4 Do not tighten the terminal screws too much otherwise the screws may break 5 See the table for the terminal screw tightening torques 6 Please do not fix 2 power supply cables with 1 screw Strip 1 in 25 mm Screw with special ...

Page 11: ...rcuit Breaker MAX CKT BKR Disconnect switch shall be installed between RB unit and pull box The transmission cable connects indoor units belonging to the same RB group The transmission cable cannot be used to connect indoor units belonging to different RB groups GOOD PROHIBITED Refrigerant pipe RB group 1 RB group 1 RB group 2 RB group 2 Transmission line Transmission line Crossover wiring of powe...

Page 12: ...etting 1 RB unit address When connecting multiple RB units to 1 refrigerant system set the address at RB AD SW Rotary switch RB AD 1 Factory setting 0 Rotary switch RB AD 10 Factory setting 0 2 Refrigerant circuit address In the case of multiple refrigerant systems set REF AD SW for each refrigerant system Set to the same refrigerant circuit address as the outdoor unit Rotary switch REF AD 1 Facto...

Page 13: ...ing 24V across pins 1 3 c The allowable current is DC 5mA to 10 mA Recommended DC 5mA Provide a load resistance such that the current becomes DC 10mA or less Select very low current use contacts usable at DC 12V DC 1mA or less d The polarity is for pin 1 and for pin 3 Connect correctly When connected to Apply voltage terminals of multiple RB units with a connected unit be sure to make a branch out...

Page 14: ...er is turned on Lit Lit The wiring is incorrect The IN U terminal of RB unit and outdoor unit transmission terminal are connected with the transmission cable Correctly connect the wiring When re wiring you must turn off the power Lit Flashing There is a fault with the communication board or the main board 0 1s ON 0 1s OFF ...