6.1.1
ADDITIONAL TO INSTALLATION OF THE RACKS
*)
The processor is delivered complete assembled, except the transport racks, dryer and film catch tray.
*)
Transport fixings must be removed before use.
*)
Insert each rack at the location indicated by reference number or label.
*)
Rinse the tanks with water and then fill it to the red marker on the tank wall.
*)
Insert the racks according the reference number or label
*)
Turn on the transport motor and check rotation
*)
Insert racks carefully and slowly, avoiding chemistry splashes.
RACK 1
in the developer tank
RACK 2
in the fixer tank
RACK 3
in the water tank
6.1.2 ADDITIONAL TO INSTALLATION OF THE DRYER-RACK
Dryer Rack
in the dryer
5.1.6
ADDITIONAL TO THE FIX RACK
hose connector for spray bar
heat exchanger
circulation pump
circulation
fix
level
fix inlet pipe
valve to switch the fixer
for the spray-bar