
7 - 1
INZ-TN2ZKJ-E
7. MAINTENANCE
7.1 Daily check
(1) Zero calibration and span calibration
q
Perform zero calibration. For the calibration procedures, refer to “Item 6.9.1 Zero calibra-
tion”.
w
Then, perform span calibration. For the calibration procedures, refer to “Item 6.9.2 Span
calibration”.
e
Zero calibration and span calibration should be carried out once a week, as required.
(2) Flow rate check
q
Sampling gas flow and purge gas flow are as follows:
•
Sampling gas flow:
0.5L/min
±
0.2L/min
•
Purge gas flow:
About 1L/min
w
Check and maintenance should be carried out every day, as required.
7.2 Daily check and maintenance procedures
Table 7.1 Maintenance and check table